background image

 

 

BWT AQA Detector: Quick guide 

 

BWT Danmark A/S, Geminivej 24, 2670 Greve, Tlf.: 43 600 500

 

5 / 12 

EN 

EN 

5.  Fastening the box 

a.  Fasten the bottom of the box to the wall using 2 screws so that the cable gland 

are pointing downwards. 

b.  Click the top on to the bottom part. 

6.  Position the AQA Stop Floor Sensor 

Important! 

Position the AQA Stop Floor Sensor on the floor near the unit so that it 

slopes towards the AQA Stop Floor Sensor. 

7.  Switch on the power supply 

The alarm lamp on the box will shine green and if the solenoid valve is closed, it 
will now open.

 

8.  Check the solenoid Valve 

Important: It must be checked once every year 

a.  Check that the solenoid is open. 
b.  Switch off the power and check that the solenoid valve closes. 
c.  Switch on the power.  
d.  When the Alarm light shines green, make the AQA Stop Floor Sensor wet (e.g. 

by dipping it into a cup of water).  

e.  Check if the solenoid valve closes and the Alarm lamp turns red.  
f.  Switch off the power to reset the water alarm. 
g.  When the Alarm lamp has switched off (it takes approx. 15 seconds), switch 

the power back on.  

h.  The solenoid valve opens and the Alarm lamp now shines green. 

The testing is completed. 
 

 

 

Summary of Contents for AQA Detector

Page 1: ...Guide to installation of BWT AQA Detector 659997501 EN DE DK 1 0 2020 QUICK GUIDE EN DE DK ...

Page 2: ...e checked once every year 5 Mode of operation and function EN 6 1 If everything is okay 6 2 In case of leakage 6 3 Power failure 6 4 In case of water damage 6 Montage des AQA Detectors DE 7 1 Das AQA Detector Gehäuse demontieren die Hinterseite abnehmen 7 Der Teil mit der Platine benutzen 7 2 Die 12V Stromversorgung anschliessen 7 3 Magnetventil anschließen 7 4 AQA Stop floor sensor anschließen 7 ...

Page 3: ...siden 10 2 Forbind 12V strømforsyning 10 3 Forbind magnetventil 10 4 Forbind AQA Stop floor sensor 10 5 Fastgørelse af boks 10 7 Tænd for strømforsyningen 11 8 Kontroller magnetventilen Vigtigt Skal kontrolleres en gang om året 11 Drift og funktion DK 12 1 Hvis alt er ok 12 2 I tilfælde af lækage 12 3 Strømsvigt 12 4 I tilfælde af vandskade 12 Mounting of wire Montage von Drähten Montering af ledn...

Page 4: ...o See page 3 3 Connect the solenoid Valve See the installation guide on the solenoid valve EV228BW a Connect the solenoid valve to the terminals marked VALVE in the AQA Detector box b Cut off the earth wire yellow green c Lead the cable through the cable gland in the middle The blue wire is to be connected to 0 and the brown wire to C See page 3 4 Connect the AQA Stop Floor Sensor a Connect the AQ...

Page 5: ...e box will shine green and if the solenoid valve is closed it will now open 8 Check the solenoid Valve Important It must be checked once every year a Check that the solenoid is open b Switch off the power and check that the solenoid valve closes c Switch on the power d When the Alarm light shines green make the AQA Stop Floor Sensor wet e g by dipping it into a cup of water e Check if the solenoid...

Page 6: ...he AQA detector shuts down the water supply b Find the reason for the leakage and repair it c Wipe off the AQA Stop Floor Sensor d Switch off the power to the AQA Detector in order to reset the water alarm e When the Alarm lamp has switched off this takes approx 15 seconds switch on the power to the AQA Detector f The solenoid valve opens and the Alarm lamp shines green 3 Power failure If there is...

Page 7: ...ßen Siehe Seite 3 3 Magnetventil anschließen Sehen Einbauanleitung betr Magnetventil EV228BW a Das Magnetventil an den Klemmen mit der Kennzeichnung VALVE im AQA Detector Gehäuse anschließen b Das Erdungskabel abschnitten gelb grün c Das Kabel durch die Kabelverschraubung in der Mitte führen Die blaue Leitung muss in 0 und die braune Leitung in C angeschlossen werden Siehe Seite 3 4 AQA Stop floor...

Page 8: ...am Gehäuse leuchtet grün und das Magnetventil öffnet sich falls es geschlossen war 8 Magnetventil prüfen Beobachten dies muss einmal jährlich geprüft werden a Prüfen ob das Magnetventil geöffnet ist b Strom ausschalten und prüfen ob das Magnetventil sich schließt c Strom einschalten d Wenn die Alarmlampe grün leuchtet den Sensor anfeuchten evtl in eine Tasse tauchen e Prüfen ob das Magnetventil si...

Page 9: ...t die Wasserversorgung ab b Die Ursache des Lecks finden und beheben c Den AQA Stop Floor Sensor abtrocknen d Die Stromzufuhr zum AQA Detector unterbrechen um das Wasseralarm zurückzustellen e Wenn die Alarmlampe erlischt es dauert ca 15 Sekunden den Strom wieder einschalten f Nun öffnet sich das Magnetventil und die Alarmlampe leuchtet grün 3 Stromausfall Bei Stromausfall schließt sich das Magnet...

Page 10: ...iden for magnetventilen EV228BW a Forbind magnetventilen til klemmerne mrk VALVE i AQA detector boksen b Klip jordledning af gul grøn c Kabel føres gennem kabelforskruningen i midten Den blå ledning skal monteres i 0 og den brune ledning monteres i C Se side 3 4 Forbind AQA Stop floor sensor a Forbind AQA Stop floor sensor til klemmerne mrk SENSOR i AQA detector boksen b Kabel føres gennem kabelfo...

Page 11: ...den er lukket 8 Kontroller magnetventilen Vigtigt Skal kontrolleres en gang om året a Kontroller om magnetventilen er åben b Sluk for strømmen og kontroller om magnetventilen lukker c Tænd for strømmen d Når Alarm lampen lyser grønt gøres AQA Stop floor sensor våd Dyp den evt i en kop e Kontroller om magnetventilen lukker og Alarm lampen skifter til rød f Sluk for strømmen for at nulstille vandala...

Page 12: ...er til rød AQA detector lukker for vandforsyningen b Find årsag til lækagen og udbedr det c Aftør AQA Stop floor sensor d Sluk for strømmen til AQA detector for at nulstille vandalarmen e Når Alarm lampen er slukket det tager ca 15 sec tændes for strømmen til AQA detector f Magnetventilen åbner og Alarm lampen lyser grønt 3 Strømsvigt Hvis der opstår strømsvigt lukker magnetventilen og når strømme...

Reviews: