background image

Manufactured By

Byan Systems, Inc. 

413 Linden 

Lusk, WY 82225 

(307)334-2865 
(800)223-2926

 

 

 

 
Device Control System Power: 

Connect outgoing power to the gate control system to TB2 using included wiring  
(14/3 cord): 

1.

 

115VAC Hot (Black) 

2.

 

115VAC Neutral (White) 

3.

 

Earth Ground (Green) 

 

Commercial Power 

 

Connect in-coming 115VAC single phase commercial power to TB1: 

1.

 

115VAC Hot (Black) 

2.

 

115VAC Neutral (White) 

3.

 

Earth Ground (Green) 

 
Device Control Functions

 

Connect supplied function control wiring harness (18/6 cord) to TB3  

1.

 

Remote control device 

2.

 

Motor 1 open contact. 

3.

 

Motor 1 open common. 

4.

 

Motor 1 cycle common. 

5.

 

Motor 1 cycle contact. 

6.

 

Motor 2 cycle contact. 

7.   Motor 2 cycle common. 

 

 

8.   Motor 2 open common. 

 

 

9.   Motor 2 open contact. 

                      10.   NOT USED 

1  2  3  4  5  6  7  8  9  10 

3  2  1 

3  2  1 

K1 four pole relay 
 

R

elay

 

R

el

ay

  

re

la

y

 

Main chip 

Dip switch 

TB2 

TB1 

TB3 

Summary of Contents for SBBI-2

Page 1: ... the top of page 2 2 5 Foot Lead In Cables for Battery to Inverter Connection 100 Amp Fuse for Installation between Positive Battery Terminal and Inverter Fuse Holder Customer supplied Items Battery see page 3 for Selection Guidelines Battery Enclosure Weather Resistant Enclosure Connectors Commercial Power Input Wiring Installation and Wiring Instructions Inverter Installation 1 Unpack inverter f...

Page 2: ...gle phase commercial power to TB1 1 115VAC Hot Black 2 115VAC Neutral White 3 Earth Ground Green Device Control Functions Connect supplied function control wiring harness 18 6 cord to TB3 1 Remote control device 2 Motor 1 open contact 3 Motor 1 open common 4 Motor 1 cycle common 5 Motor 1 cycle contact 6 Motor 2 cycle contact 7 Motor 2 cycle common 8 Motor 2 open common 9 Motor 2 open contact 10 N...

Page 3: ... are shipped in a separate package Fuse is already installed on positive battery cable CAUTION Connect battery only after commercial power is connected and turned on to the device Connecting battery before commercial power is turned on could result in device moving and possibly injuring persons or causing damage to property Battery Selection Guidelines SBBI recommends 12VDC Maintenance Free sealed...

Page 4: ...inverter is started first gate s is commanded to open after about 60 seconds second gate s is commanded to open after 60 seconds inverter is stopped and system waits for power restoration After power restoration power is verified for about 10 seconds a cycle command is issued causing gates to operate to the closed position DIP SWITCH SELECTION Position 1 Down Selects single gate system operation S...

Page 5: ...e Byan Systems prewire 2 115VAC Hot Black 3 115VAC Neutral White 4 Earth Ground Green Gate Control Functions Connect supplied function control wiring harness to TB3 in a battery back up to accessory terminals on the G2M control board not installed in a Byan Systems prewire SBBI TB3 G2M Accessory Terminals 1 Empty Not Used 2 Black 18 master board 3 White 16 master board 4 Green jumper from 3 16 mas...

Reviews: