EPS14
21
SM-EPS142016002-EN
2. Main Lift Chain Replacement Replacement Procedure
(1) Lower the mast fully.
(2) Use a reliable hoisting strap to the hang the upper beam of the carriage, and secure the strap with a safety hook. Slowly lift
the hook to make chains slack, and then block it.
(3) Remove the split pin and the pin on the outer mast side and pull the chain off from the sheave.
(4) Remove the split pin and the pin on the other side.
(5) Follow the steps in reverse to replace chains as a set, and adjust the chian after replacement.
3-Stage Free Lift Mast (4 Cylinders) Chain Replacement
1. Explosive View
< B >
89
89
89
89
89
89
89
89
89
89
89
89
89
89
89
89
89
89
11
83
83
11
11
11
83
83
10
14
16
16
17
84
85
20
< A >
12
13
87
87
88
88
12
89
89
< C >
12
13
87
87
88
21
88
< B >
< A >
< A >
< C >
Code
Name
QTY
Information
Code
Name
QTY
Information
10
Free Lift Chain Set
1
21
Chain
2
11
Chain Sheave
4
83
Circlip
4
12
Chain
2
84
Bolt Assy M12×70
1
14
Chain Sheave Head
1
85
Hexagon Flange Bolt M6×16
1
16
Washer
2
87
Split Pin
8
17
Protection
1
88
Pin
8
20
Free Lift Chain Set
1
89
Nut M16
20
2. Main Lift Chain Replacement
(1) Lower the mast fully.
(2) Use a reliable hoisting strap to the hang the upper beam of the inner mast, and secure the strap with a safety hook. Slowly
lift the hook to make chains slack, and then block it.
(3) Remove the split pin and the pin on the outer mast side and pull the chain off from the sheave.
(4) Remove the split pin and the pin on the other side.
(5) Follow the steps in reverse to replace chains as a set, and adjust the chian after replacement.
Summary of Contents for EPS14
Page 1: ...SERVICE MANUAL SM EPS142016002 EN EPS14...
Page 2: ......
Page 3: ...This manual is used for authorized personnel to sevice BYD forklifts...
Page 57: ...EPS14 53 SM EPS142016002 EN...
Page 59: ......
Page 60: ......