6
QUESTIONS / HELP?
Call C-Aire at 651.462.3440
CAUTION!
Verify all wires are secure and fasteners
are tightened before connecting power to unit.
Dashed lines represent wires supplied by others.
At installation, the customer is to provide:
Disconnect and branch circuit overcurrent protection and
grounding between the power supply and the electrical
control enclosure in accordance with the National Electrical
Code (NEC), the Canadian Electrical Code (CEC) and / or
any local codes having precedence.
THREE PHASE STANDARD MAGNETIC MOTOR STARTER
WITH AUTOMATIC START/STOP CONTROL
PRESSURE
SWITCH
MOTOR
BLK
BLK
BLK
OL
OL
L1
L2
L3
M
T1
T2
T3
MOTOR CIRCUIT
OVERCURRENT
PROTECTION
M
A1
96
A2
95
(OPTIONAL)
BLK
BLK
THREE PHASE STARTER BOX
INSTRUCTIONS
1) Connect to Main Power Lead
2) Tighten ( )
3) Record Amps/Volts on Checklist
(Located in Owner’s Manual on page 14)
Wire to switch
Ground Wire
Main Power Into Here
Wire From the Motor
TOP VIEW
Main Power Into Here
WIRING DIAGRAM
(For units with Magnetic Starters)
Summary of Contents for S1300HD
Page 1: ......