background image

21/08/2019 

 

2

 

Safety 

C-Flow® LAB 1x1 weighs 1.25 kg when assembled and precautions should be taken to avoid injuries 
to feet if the unit is accidentally dropped. Safety shoes should be worn when unpacking, assembling, 
disassembling or moving the cell. 

The user should carry out a risk assessment before using the C-Flow® LAB 1x1. This should include 
a COSHH assessment for the substances under test. Suitable Personal Protective Equipment should 
be worn and other suitable measures taken to control the risk of exposure to substances hazardous 
to health. 

Due to risk of chemical release at pressure, it is recommended that the user measure the pressure 
at the entrance to the cell and restrict the liquid flow rate so that the pressure does not exceed 1 
bar (gauge). The user should check the pressure rating of any tubing or fittings used with the cell 
(not provided). It is recommended that the cell be checked for leaks with a non-hazardous substance 
(e.g.  water)  every  time  it  is  reassembled.  It  is  the  responsibility  of  the  user  to  complete  a  risk 
assessment for all aspects of use. 

 

3

 

Unpacking 

C-Flow® LAB 1x1 is shipped already assembled but not tightened. It is recommended that the cell 
be dismantled and reassembled before use. This will familiarise the user with its construction and 
to allow user to make changes to the cell set-up e.g. addition of membrane (not provided). 

Take care when unpacking the cell to avoid dropping it and causing damage or injury. 

 

 

Summary of Contents for LAB 1x1

Page 1: ...21 08 2019 1 C Flow LAB 1x1 Instruction Manual...

Page 2: ...Contents 1 Introduction 3 2 Safety 4 3 Unpacking 4 4 Specifications 5 5 Assembly Instructions 6 6 Parts List and Exploded View 7 7 Troubleshooting 9 8 Cleaning 9 9 Templates 9 10 Other C Flow Product...

Page 3: ...d is shown in the on line video demonstration The unit is designed for ease of use and no tools are required for assembly The cell comes equipped with a set of electrodes but it is designed so that yo...

Page 4: ...r measure the pressure at the entrance to the cell and restrict the liquid flow rate so that the pressure does not exceed 1 bar gauge The user should check the pressure rating of any tubing or fitting...

Page 5: ...x 10 mm Electrode material carbon supplied as standard Current collectors brass Electrolyte ports PEEK Reference electrode blanks PEEK Cell Frames CPVC Gasket material EPDM Membrane material not suppl...

Page 6: ...tional Fit Membrane Gasket Membrane and second Membrane Gasket The purpose of the Membrane Gaskets is to locate a Membrane if used Fit O Ring into face of Front Frame and fit the Front Frame over the...

Page 7: ...Current Collector 2 9 Electrode 2 10 Electrode Gasket 2 11 Reference Electrode Port Plug 2 12 Electrode Port 1 8 4 13 Electrode Port 1 16 2 14 Back Frame 1 15 O Ring ID 40 95 Dia 2 62 1 16 Membrane G...

Page 8: ...21 08 2019 8...

Page 9: ...ow Rate Check piping not kinked Poor Electrical Contact Check Current Collector face is clean and bright Use solvent and or gentle abrasive Check rear side of electrode is clean Use solvent and gentle...

Page 10: ...cess development in industry or academia A wide variety of electrochemical processes can be carried out on C Flow PLT including the treatment of dilute systems e g waste water chemical synthesis visco...

Page 11: ...h Innovation Ltd does not accept liability for any direct or consequential loss arising from use of this manual or its contents and gives no warranty or representation express or implied as to the fit...

Page 12: ...21 08 2019 12 C Tech Innovation Ltd Capenhurst Technology Park Capenhurst Chester UK CH1 6EH Tel 44 0 151 347 2900 info ctechinnovation com www ctechinnovation com...

Reviews: