INSTALLATION AND OPERATION
1. UNPACKING and HANDLING
Each unit is shipped with all equipment assembled, and factory tested.
Ensure that all accessories are removed from the container before discarding packing
material
2. MECHANICAL
INSPECTION
Inspect the front and rear of the equipment for shipping damage. Make sure the equipment is
clean, and no connectors are broken, damaged, or loose. If equipment appears to be
damaged or defective please contact us at 1-610-429-1511 for assistance.
3. PRODUCT
DIAGRAM
NOTE TO SYSTEM INSTALLER
System installer must adhere to Article 820-40 of the NEC that
provides guidelines for proper grounding and specifies that the
cable ground shall be connected to
the grounding system of the
building
, as close to the point of cable entry as practical.
e
c
d
f
MODEL CTA-30/1000
1000 Mhz Push-Pull Distribution Amplifier
54-1000 Mhz
30 dB GAIN
g
h
i
3