background image

 
 

INSTALLATION AND OPERATION

 

 
 

 

 

 

1.  UNPACKING and HANDLING 

 

Each unit is shipped with all equipment assembled, and factory tested. 
 
Ensure that all accessories are removed from the container before discarding packing 
material 
 

2. MECHANICAL 

INSPECTION 

 

Inspect the front and rear of the equipment for shipping damage. Make sure the equipment is 
clean, and no connectors are broken, damaged, or loose.  If equipment appears to be 
damaged or defective please contact us at 1-610-429-1511 for assistance.

 

 
 

3. PRODUCT 

DIAGRAM 

 
 
 

 

 

 

NOTE TO SYSTEM INSTALLER 

 

System installer must adhere to Article 820-40 of the NEC that 
provides guidelines for proper grounding and specifies that the 
cable ground shall be connected to 

the grounding system of the 

building

, as close to the point of cable entry as practical. 

  

e

                                 

c

           

d

                                                       

f

 

MODEL CTA-30/1000

1000 Mhz Push-Pull Distribution Amplifier 

54-1000 Mhz 

30 dB GAIN 

      

g

                                                                                                                      

h

   

i

 
 

 

3

Reviews: