2-3
Installing the 9C214-3 Power Supply
Powering Up the 9C214-3 Power Supply
The 9C214-3 Power Supply is powered up by following the steps below:
1. Plug one end of the power cord (supplied with the power supply) into the AC
power socket on the lower right front corner of the power supply.
2. Plug the other end of the power cord into an AC receptacle. Turn on the power
supply using the switch located near the power socket.
3. The power supply uses a soft start feature and does a pre-power diagnostic
check. Outputs become enabled within 5 seconds of turning the power on.
4. Check to make sure that
a. The PWR Status LED is green.
b. The SMB Status LED is green.
If the LEDs are any color other than green, refer to
LANVIEW LEDs
in Chapter 3.
Before you turn the power switch on, make sure that the Environmental Module and all
Interface Modules have been properly installed.
NOTE
Summary of Contents for 9C214-3
Page 1: ...9032529 01 SmartSwitch 9000 9C214 3 AC Power Supply Installation Guide...
Page 2: ......
Page 6: ...Notice iv...
Page 8: ...Contents vi...
Page 14: ...Introduction 1 6...
Page 18: ...Installing the 9C214 3 Power Supply 2 4...
Page 26: ...Specifications 4 4...