INSTALLATION
Page 3-15
Figure 3-13. Connecting a Fiber Optic Link
Segment to a SPIM-F1 or SPIM-F2
3.
Attach the fiber labeled 2 to the applicable transmit port labeled
TX, on the module.
4.
At the other end of the fiber optic cable, attach the fiber labeled 1
to the transmit port of the device.
5.
Attach the fiber labeled 2 to the receive port.
6.
Check that the Link LED on the applicable port on the module is
lit. If the LED is not lit, perform each of the following steps until
it is:
a.
Check that the power is turned on for the device at the other
end of the link.
b.
Verify that the fiber strands are properly “crossed over”
between the applicable port on the module and the fiber optic
device at the other end of the fiber optic link segment.
RCV
LNK
SP
SPIM-F2
RX
TX
ST CONNECTORS
RCV
LNK
SP
SPIM-F1
RX
TX
SMA CONNECTORS
To connect a fiber optic link segment to a SPIM-F1 or a SPIM-F2:
1.
Remove the protective plastic covers from the fiber optic ports on
the applicable port on the module and from the ends of the
connectors on each fiber strand.
2.
Attach the fiber labeled 1 to the applicable receive port, labeled
RX, on the module (Figure 3-13).
Summary of Contents for MRX
Page 11: ...INTRODUCTION Page 1 6...