Central Control Module 7896
2-13
Revision B2005-2
B-Type
F
,
7HVW
#
PRWRU
#
IDGHUV
In the system menu, select “
Test Routines?”
using the Up or Down arrow button.
The display shows “
Test Routines?”.
■
■
■
■
Press [
↵
], followed by the Down Arrow button, until the display shows “
Test Motor
Fders?
”
■
■
■
■
Press [
↵
]. The Motor faders should now move up and down (they move slower at
the bottom end). Check that all Motor faders are moving at the same rate and that
they run smoothly.
■
■
■
■
Press [Esc] to return to the system menu or Down arrow to perform next test.
G
,
7HVW
#
NH\V
In the system menu, select “
Test Routines?”
using the Up or Down arrow button.
The display shows “
Test Routines?”.
■
■
■
■
Press [
↵
], followed by the Down Arrow button, until the display shows “
Test
Keys?
”
■
■
■
■
Press [
↵
]. The display shows
“Button = ...”
■
■
■
■
Press each of the buttons, including the P & N buttons (but not the Esc button) in
turn, ensuring that the display shows what button has been pressed.
■
■
■
■
Check also the external P & N.
Press [Esc] to return to the system menu.
H
,
7HVW
#
0,',
In the system menu, select “
Test Routines?”
using the Up or Down arrow button.
The display shows “
Test Routines?”.
■
■
■
■
Press [
↵
], followed by the Down Arrow button, until the display shows “
Test
MIDI?
”
■
■
■
■
Press [
↵
]. This test outputs programme change to the MIDI-connections on the
back of the CCM, indicating channel changes in ascending order for MIDI A (1-16)
and in descending order for MIDI B (16-1).
To perform a cable test and to ensure MIDI-cables have not been crossed over, a
cable can be connected between MIDI out and MIDI in. This will cause a flashing “A”
if connected between MIDI A output and MIDI A input and a flashing “B” if connected
between MIDI B output and MIDI B input.
Press [Esc] to return to the system menu or Down arrow to perform next test.
I
,
7HVW
#
HYHQWV
In the system menu, select “
Test Routines?”
using the Up or Down arrow button.
The display shows “
Test Routines?”.
■
■
■
■
Press [
↵
], followed by the Down Arrow button, until the display shows “
Test
Events?
”
■
■
■
■
Press [
↵
]. Make sure that the Events enable switch is on. The LED’s indicating
events should now come on and off in sequence. Turning the enable switch off
should cause all the LED’s to extinguish.
■
■
■
■
Press [Esc] to return to the system menu or Down arrow to perform next test.
J
,
7HVW
#
)GU
#
&RPPV
In the system menu, select “
Test Routines?”
using the Up or Down arrow button.
The display shows “
Test Routines?”.
■
■
■
■
Press [
↵
], followed by the Down Arrow button, until the display shows “
Test
Comms?
”
■
■
■
■
Press [
↵
↵↵
↵
]. The display shows “Comms busses OK” for a few seconds before
returning to “
Test Comms?”
Summary of Contents for B-Type
Page 1: ...Audio Mixing Console 056 6 10 n 95 4 1 07 g8 2...
Page 6: ...vi General Precautions B Type Revision B2005 2...
Page 8: ...viii Introduction B Type Revision B2005 2...
Page 48: ...2 20 Central Control Module 7896 B Type Revision B2005 2...
Page 86: ...6 10 Group Module 7756 B Type Revision B2005 2...
Page 96: ...7 10 Grand Master Group module 7795 B Type Revision B2005 2...
Page 106: ...9 4 Auxiliary Output Module 7468 B Type Revision B2005 2...
Page 122: ...11 10 Osc Comms PFL module 7758 M Type groups B Type Revision B2005 2...
Page 130: ...12 8 Osc Comms PFL module 7635 F Type groups B Type Revision B2005 2...