ZEFIRO
3
- ZEN AIRTIGHT
2
SUMMARY
1 MANUAL SIMBOLOGY ....................................3
2 PACKAGING AND HANDLING ..........................3
2.1 PACKAGING .............................................................3
2.2 REMOVING THE STOVE FROM THE PALLET ..............3
2.3 STOVE HANDLING....................................................4
3 CHIMNEY FLUE .............................................4
3.1 PREPARING THE SMOKE EXPULSION SYSTEM .........4
3.2 CHIMNEY COMPONENTS .........................................4
3.3 SMOKE DUCT (SMOKE FITTING) ..............................4
3.4 FLUE (CHIMNEY OR PIPED DUCT) ...........................5
3.5 CHIMNEY POT ..........................................................6
3.6 MAINTENANCE ........................................................7
4 COMBUSTION AIR .........................................7
4.1 AIR INLET ................................................................7
4.2 COMBUSTIBLE AIR INLET FOR SEALED-CHAMBER
INSTALLATION ...................................................................8
5 EXAMPLES OF INSTALLATION (DIAMETERS AND
LENGTHS TO BE SIZED) ........................................9
6 INSTALLATION ............................................10
6.1 INTRODUCTION .....................................................10
6.2 MINIMUM DISTANCES ...........................................11
6.3 INSULATING MATERIAL .........................................12
6.4 OVERALL DIMENSIONS .........................................12
6.5 INSERT EXTRACTION .............................................13
6.6 INSERT REMOVAL ..................................................14
6.7 INSTALLATION WITH EXTERNAL COVER ................15
6.8 INSTALLATION ON EXISTING FIREPLACE ...............16
6.9 DOOR ADJUSTMENT ..............................................17
6.10 CONNECTION TO THE EXTERNAL THERMOSTAT .....18
6.11 ELECTRIC CONNECTION .........................................18
6.12 AIR REGULATOR ....................................................19
6.13 INSERT LEGS INSTALLATION (OPTIONAL) .............19
6.14 HOT AIR DUCTING (OPTIONAL ONLY FOR ZEFIRO
3
) ...20
6.15 PELLET DRAWER INSTALLATION (OPTIONAL ONLY
FOR ZEFIRO
3
) ...................................................................22
6.16 TRAPDOOR INSTALLATION (OPTIONAL) ................24
6.17 FRAME INSTALLATION (OPTIONAL) ......................26
6.18 CONCENTRIC PIPE INSTALLATION (OPTIONAL) .....26
6.19 DISPLAY ROTATION ...............................................27
7 WI-FI KIT INSTALLATION .............................28
8 SPECIAL MAINTENANCE ..............................28
8.1 INTRODUCTION .....................................................28
8.2 FEED SCREW MAINTENANCE.................................29
8.3 FLUE GAS EXTRACTOR CLEANING..........................29
8.4 FUME PIPES ANNUAL CLEANING .........................30
8.5 GASKET REPLACEMENT .........................................31
8.6 GLASS REPLACEMENT ...........................................31
9 IN CASE OF ANOMALY ..................................31
9.1 PROBLEM SOLVING ...............................................31
10 TECHNICAL DATAS ......................................34
10.1 FUSE REPLACEMENT .............................................34
11 FEATURES ..................................................34
Summary of Contents for ZEFIRO3-ZEN AIRTIGHT
Page 35: ...NOTE ...