ZEFIRO
3
- ZEN AIRTIGHT
20
•
Fix the 2 reinforcement crosspieces of the structure (see
Fig. 33
).
•
Also fix the reinforc the extensions assembled previously (see
Fig. 34
).
•
Place the insert above the structure, fixing it with the screws in the appropriate seats (see
Fig. 35
).
Fig. 33 - Assemble reinforcements
Fig. 34 - Assemble reinforc extensions
to the structure
Fig. 35 - Fix insert above
•
Position the structure with the insert as desired and fix the legs to the floor and the extensions to the wall behind (see
Fig. 36
).
Fig. 36 - Fix the structure to the floor and wall
6.14 HOT AIR DUCTING (OPTIONAL ONLY FOR ZEFIRO
3
)
WITH THE INSTALLATION OF THE DUCTING, IT IS NECESSARY TO LOAD THE NEW DATABASE IN THE BOARD (DA-
TABASE NO.02).
SEE “SERVICE MANUAL”.
By default, the insert inserts the hot air into the environment from both the front vents.
It is possible to channel the left air on the back of the stove, through a ducting kit.
To assemble the kit, proceed as follows:
•
Extract the machine body.
•
Remove the 4 fixing screws of the left fan (see
Fig. 37
).
•
Use a clamp to break the corner of the casing (see
Fig. 38
) and bend the flap inwards with your hands (see
Fig. 39
).
Summary of Contents for ZEFIRO3-ZEN AIRTIGHT
Page 35: ...NOTE ...