©2021 CAE 905K640152 v1.2
95
Care and Maintenance
e. Infuse until clear fluid flows from the IV drain tubing.
Flushing the IV Fill/Drain Tubing
f. Disconnect the syringe and fill the syringe with air.
g. Flush the IV prime port with air until air flows from the IV drain tubing.
h. Disconnect syringe from IV prime port.
i. Disconnect the IV tubing and bag from the IV drain port.
j. Empty the IV bag.
k. Reconnect the IV tubing and empty IV bag to the drain port.
Step 3: Maintaining IM Injection Sites
If the simulation included use of IM injection equipment, perform the following steps prior to storing
the manikin:
a. Remove the pad from the injection site.
Summary of Contents for Ares
Page 1: ...User Guide Your worldwide training partner of choice...
Page 32: ...Equipment Overview 26 2021 CAE 905K640152 v1 2 CAEAres THIS PAGE INTENTIONALLY LEFT BLANK...
Page 36: ...Meet Ares 30 2021 CAE 905K640152 v1 2 CAEAres THIS PAGE INTENTIONALLY LEFT BLANK...
Page 56: ...Setup 50 2021 CAE 905K640152 v1 2 CAEAres THIS PAGE INTENTIONALLY LEFT BLANK...
Page 98: ...Using Ares 92 2021 CAE 905K640152 v1 2 CAEAres THIS PAGE INTENTIONALLY LEFT BLANK...