Initial Setup
3.14 Testing installation
It is important to have the equipment performing several cycles before completing the installation. It is
important that you order at least 2 of each product selections to insure that the brewer is operating as per
the specifications laid out in this manual. During this process, review the check list as a reminder.
You need to be sure that the brewer is clean, safe and functioning once you’re ready to leave it on-site.
What to check
Inlet valve is free from leaks
Verify that it is secure and not
overtightened
Brew chamber is empty of coffee
Verify that the unit is leveled
Filter paper feeds without resistance
and goes straight into the waste bin
Verify that the chute is properly installed
Repeat the installation procedure
Soluble mixing bowl is free of leaks
Verify that it is on straight and tube is
secure
Water temperature is acceptable
See water temperature
Products are loaded
Load products
Brewer and area are clean and tidy
Please tidy up