9. Get on top of the platform you placed
on the 2nd floor and put the guardrail
frames into the fitting tool of the mo-
dular frames of the 2nd floor. Pass the
security pint of the guardrail frames
from the holes of the modular frames
and lock them. (Diagram 11)
10. Get on top of the platform with trap-
door on the 1st floor and carry the
modular frame of the 2nd floor to the
7th step. (Diagram 12) Don’t forget to
open the wind lock while disassemb-
ling the platforms.
11
12
13
EN
Summary of Contents for ProTUBE F
Page 35: ... ...