8. Get on top of the platform you placed
on the 2nd floor and put the guardrail
frames into the fitting tool of the mo-
dular frames of the 2nd floor. Pass the
security pint of the guardrail frames
from the holes of the modular frames
and lock them (Drawing 11).
9. Fix the horizontal security con-
nections of the guardrail. Make
sure the aluminum cast clam-
ps are safely seated and locked
(Drawing 12).
11
12
23
EN
Summary of Contents for ProTUBE F
Page 35: ... ...