8. Then carry it upwards onto the 7th
step of the 2nd floor and fix it. Don’t
forget to open the wind lock while di-
sassembling the platforms. After this
your scaffold will rise for another flo-
or (Drawing 9)
9. Get on top of the platform you placed
on the 2nd floor and put the guardrail
frames into the fitting tool of the mo-
dular frames of the 2nd floor. Pass the
security pint of the guardrail frames
from the holes of the modular frames
and lock them (Drawing 10)
8
9
30
EN
Summary of Contents for ProTUBE L
Page 35: ......