Personal Ambulatory Oxygen System
Provider Technical Manual
39
ANNUAL MAINTENANCE PROCEDURES
The following section lists procedures that are necessary to maintain the Eclipse. Service should only be performed by a
qualified technician. To perform periodic maintenance, the only tools that should be necessary are:
•
#1 Phillips Screwdriver
•
Wire-cutting pliers
•
Small cable ties
•
ESD Mat or approved ESD system
Figure 11: Maintenance Tools.
REMOVING THE UNIT COVER
1. Disconnect power supplies and remove Power Cartridge before removing the unit cover.
2. Place the unit horizontally on the front cover.
3. Using a Phillips #1 screwdriver, remove a total of 10 screws (M3x12 Pan Head SEM Screw,
P/N 6974-312-SEQ) from the back of the unit.
•
Keep hands out of moving parts
•
Disconnect power supplies and remove Power Cartridge before
removing the unit cover.
•
ESD Safety procedure must be in place.
WARNING: