2. Product installation instructions 

1.3 The structure of battery

Battery is made up by the electrode assembly, the positive terminal and 

negative terminal, safety valve, the shell cover and the shell. Electrode group 

consists of positive and negative electrode terminal and seperator (seperator 

plays a barrier between the positive and negative electrode).The shell interi-

or is filled with the electrolyte. Safety valve on the shell cover can release the 

battery internal pressure and prevent explosion.

2.1 Battery Requirements 

1) Please read this instruction and other instructions carefully before using the battery.

2) Unless otherwise specified, the charging and discharging parameters of CALB lithium iron phosphate batteries series are 

described as follows: 

 

•   Cut-off charging voltage for single battery: 3.65V (Switch off voltage for single battery charging: 3.8V. Once the cell voltage 

rises to 3.8V, the charging current should be immediately cut off); 

 

•  Cut-off charging voltage for N batteries in series: N × 3.65V (when the cell voltage rises to 3.65V, the charger should be able 

to automatically change to constant voltage charging mode); 

 

•   The float status: cutoff charging voltage for single battery is set to 3.4V, cut-off voltage for N batteries charging in series is 

N×3.4V, with a maximum voltage of 3.4V cut-off; 

 

•   Alarming discharging voltage for single battery: 2.8V (during the discharging process, when the cell voltage drops to 2.8V, 

BMS will alarm, we recommend stopping discharging now); 

 

•   Cut-off discharging voltage for single battery: 2.5V (under -20

 condition,the cutoff voltage for battery discharging is 2.0V.); 

3)  CALB lithium-ion battery products shall be equipped with a special lithium battery management system and lithium battery charger 

with mode of constant current and voltage limiting. For a few small-capacity batteries are used in series, you can also use lithium 

batteries protection board of reliable performance; 

4)  In any case, terminal voltage of single cells must be monitored in real-time. Battery packs in series charging or discharging testing 

without management system or protective board is forbidden, avoiding battery overcharge or over-discharge.

5)  BMS used shall have function of insulation resistance detection, when the battery and BMS installation is complete, all protection 

parameters would be the first to set. Be sure to confirm the battery power when setting the initial value of SOC;

6) Communication protocol must be determined between the BMS and charger and motor controller. Make sure of the signal butt 

between BMS and charger and motor controller to ensure that the charger and motor controller is monitored in real-time by BMS 

during charging or discharging, avoiding over-charging or over-discharging.

7) Except in special circumstances, fresh battery from factory is only 30% charged. Before BMS and charger is commissioned, 

batteries are prohibited for long time use to avoid overcharging or over-discharging ;During battery use, we recommend charging 

and discharging range between 10-90% DOD (according to the principle of low depth of charge and discharge); 

8) Screwing the battery terminal is forbidden without permission. 

9)  Damaging the battery safety valve is forbidden without permission.

       As the case of CAM series battery is metal, it is strongly recommended to install a protector when installing CAM series batteries   

with the specific installation program to ensure the battery pack insulation. For specific installation scheme, please refer to 

Annex 2 "Instructions for CAM series battery protector installation."

Positive Terminal

Negative Terminal

Safety Valve

Shell Cover

Electrode Assembly

Shell

Screwing the battery terminal is forbidden without permission.

Damaging the battery safety valve is forbidden without permission.

2.3 Power Module layout requirements 

1) Be cautious when integrating the battery into power system. Not only should you take full consideration of ventilation inside the 

power module, but also take effective dust proof, waterproof, anti-snow, and anti-impact measures; 

2) Take full consideration of the convenience of repair and maintenance when laying out the batteries.

3) Integrate battery modules into group according to the maximum possible number of cells that a individual BMS sub-module can 

manage ablity.

4) Ensure high-pressure cables and wiring harnesses short and smooth when laying out the batteries and battery modules.

5) Because the drive motors and motor controllers are strong heating element, batteries should be layout away from them. When 

batteries are near the motor, proper insulation measures shall be taken ; 

6) When many batteries are laid out intensively, avoid the situation that adjacent terminal voltage of the battery packs is higher than 

safe voltage to prevent dangerous electric shock during construction and maintenance.

7) If the system is lay out in a compute room, fireproof materials should be equipped on the walls, ceilings and walls, firefighting 

equipment should be equipped. There should be no flammable, explosive, corrosive gases or article around the site.

2.4 Power Module Installation Requirements 

Power module or battery shall be operated in accordance with relevant instructions; 

1) After clamping, each battery group should be fixed into the power module properly with the terminals upward clamped .Placing the 

battery on its side is not recommended , installing the battery upside down is prohibited ; 

2) When clipping the power modules into group, make sure all flat washers, spring washers and nuts in readiness and tight.

2.2 Power System Requirements 

1) High-voltage main circuit and low voltage electrical circuit for battery pack shall be properly isolated. Use reliable DC air circuit 

breakers and fast DC fuses to make sure the safety under high-voltage.

2) Do not separate the lead power cord from the battery of the pack to charge a low voltage electronics in car individually.

3) The cabinet holding the system must be equipped with lightning protection and anti-tampering measures.

4) When splitting the system, battery system power should be disconnected to make sure the system can against electric shock. 

When the system is assembled, it must be ensure that joints between the power supply modules are connected correctly and 

firmly

10) 

Summary of Contents for CA100

Page 1: ...ection components installation 17 Product User Manual China Aviation Lithium Battery Co Ltd CALB Headquarter No 66 North Binhe Road High Tech Zone Luoyang Henan China 471003 Tel 86 0379 6069 7962 Fax 86 0379 6069 7995 http www calb cn http en calb cn ...

Page 2: ...ment research and production and certifications to enter into international markets including CE RoHS and UN38 3 transportation certification CALB and products have high reputa tion and influence in home and abroad markets Developing green energy is our common history mission Under the strong support of leaders at all levels and partners CALB will take the idea of AVIC Aviation to serve the countr...

Page 3: ...ing chair battery The charge and discharge mechanism of lithium ion battery can be described as the following chemical formula take lithium iron phosphate for example Lithium ion battery charge and discharge diagram Caution I A BMS battery management system or battery protection system must be used under any circumstance when using or storing battery to ensure the batteries are used under normal c...

Page 4: ...between 10 90 DOD according to the principle of low depth of charge and discharge 8 Screwing the battery terminal is forbidden without permission 9 Damaging the battery safety valve is forbidden without permission As the case of CAM series battery is metal it is strongly recommended to install a protector when installing CAM series batteries with the specific installation program to ensure the bat...

Page 5: ...it is recommend using adjustable torque wrench in 5 30N m range the recommended tightening torque values corresponding to specified bolts is shown in the following table 2 7 Power system maintenance period and measures 1 In a routine systematic check and detailed record on the power system usage as well as the work of BMS and charger detect hidden dangers and solve problems in time 2 Regularly che...

Page 6: ...be prevented from mechanical shock or stress non battery exposure and rain 6 Develop a tracking record of voltage resistance for inventory batteries check the stock battery voltage resistance every three months and make detailed records 7 Conduct a full charge discharge test inventory every six months for inventory batteries at a charge and discharge rate of 0 3C and make detailed records 3 1 Pers...

Page 7: ...ignated locations within the shortest possible time in mainland China only Time requirements For customers in China mainland CALB will response in two hours within the city in 24 hours within the province three working days or within 30 minutes to give customers a clear answer and reach to the customers within the appointed time outside the province For international customers CALB will response i...

Page 8: ... 90 0 C 45 C 20 C 55 C 20 C 45 C 20 C 25 C 70 2C 1C 2C Charging time Installation for CAM Series single battery can be followed by four steps First Install lower protector as figure 2 Installation requirements Depress the battery into the lower protector from up to down by force to ensure the battery no slant and below protector wrapping the bottom of the battery no loose connection between protec...

Page 9: ...rouping separators by one side and clamp the battery by the snap on both sides without falling down The grouping separator should be fitted with the upper and lower separator edge without warping Lower protector Grouping separator Figure 3 Step 3 Install upper protector as figure 4 Installation requirements Push the battery grouping separator by one side and clamp the battery by the snap on both s...

Page 10: ...rwise it will affect the screw installation causing protectors scratch Install the pole protectors promptly after connecting the bus bars and prevent cascading battery packs from short circuit caused by foreign objects The integrated packs should be placed on a workbench with flat and dry surface The completion of battery packs protector installation is shown above Step 2 Select screws of appropri...