background image

9

G

E

F

D

 

   

 

 

 

 

 

  07/12/2016

C

 

 

 

 

 

   

 

 

   

 

 

 

   

 

 

 

 

 

   

   

 

   

 

 

EXP PORT

OTS

RT

PREPAID

AUX

RS-485 BUS

A

B

C

Use of an external room thermostat

An  external  room  thermostat,  if  installed,  must  necessarily  be  with

potential-free contact

.

The  external  thermostat  has  to  be  connected  to  the  terminals  “RT”
shown  in  the  adjacent  figure.  The  terminals  can  be  accessed  by
removing the door on the HIU electronic regulator (see page 19).

In  case  the  thermostat  function  of  the  remote  user  interface  is
enabled, any external thermostat will work in parallel (management of
different temperature zones).
Alternatively,  when  the  thermostat  function  of  the  remote  user
interface  is  disabled,  the  interface  can  be  used  to  define  the  hourly
programming  of  the  space  heating  function  for  all  thermostats
connected to the terminals “RT”.

Refer to the user interface dedicated manual.

Filling the central heating system

Open  the  shut-off  valves  on  the  connections  to  the  centralised  line
and, in the central heating system, proceed with charging the system
to the design pressure.
Once these procedures are complete, vent the system and check its
pressure again (repeat the filling process if necessary)

N.B.

during  the  procedures  for  venting/draining  the  system  use

suitable  measures  to  avoid  the  risk  of  any  liquid  dripping  onto  the
electronic components.

Vessel pre-charge check

Perform the following steps:
-   Use a pressure gauge to check the pre-charge value
-   If  necessary,  restore  the  pre-charge  value  shown  in  the  technical

specifications.

Filling the user system

SATK32 series HIU can be fitted with a charging unit equipped with a
backflow preventer (F), check valve (E) and cock (G) (code 572120).
When  filling  the  system  for  the  first  time  or  for  subsequent  top-up
procedures following a heating circuit pressure switch fault, restore the
system pressure (0,12–0,2 MPa - 1,2–2 bar) by opening cock (G) and
checking the value by means of the pressure gauge (D).
Once the correct pressure has been reached, close the cock (G), vent
the  system  and  re-check  the  pressure  (repeat  the  filling  process  if
necessary).

System start-up

Before  starting  the  HIU,  visually  check  the  hydraulic  connections  for
the  absence  of  any  leakage  and  all  the  electric  connections.  After
finishing the check, activate the electric supply to the HIU and check
for the presence of any error signal.
If there is any, eliminate the fault indicated (see page 18) and proceed
with  setting  the  set  point  of  the  domestic  water  and  heating  cycles,
programming  the  remote  user  interface  according  to  the  desired
temperatures and times, and checking the operating cycles.

Commissioning

Fitting the cover

Fit  the  cover  on  the  HIU  by  inserting  the  pins  (A)  in  the  locations
provided (B).
Secure the cover by tightening the 4 screws provided (C).

Installation in the room

Use  the  cable  outlet  provided  for  connection  of  the  remote  user
interface to the electronic circuit board.
The chrono-thermostat function has to be enabled through the remote
control. Refer to the dedicated user manual for the procedure.

Summary of Contents for SATK32 Series

Page 1: ...de 10 Commissioning 9 Electrical installation 8 Hydraulic installation 5 Hydraulic components and diagram 4 Dimensions Technical specifications 3 Safety instructions 2 DHW function Comfort functions P...

Page 2: ...k must be carried out on the device cut off the electric supply first Do not use devices with automatic or time reset or which may be reset accidentally 4 Use suitable automatic protection devices in...

Page 3: ...nimum flow rate to activate domestic water flow meter 2 l min 0 3 Electric supply 230 V ac 10 50Hz Max power consumption 80 W Protection class IP 40 Pump UPM3 15 70 Actuators 24 V stepper motor Probes...

Page 4: ...be 10 Pressure gauge 11 Safety thermostat 12 130 mm heat meter template 13 1 4 F pressure test port 14 Connection for M10x1 heat meter return probe 15 Primary drain cock 16 Connection for M10x1 heat m...

Page 5: ...kflow preventer code 572120 proceed as follows remove the nuts shown in the figure with letter A Hydraulic installation Preliminary operations installation without template After having established th...

Page 6: ...tem in order to remove any residue or impurities that could endanger correct operation of the HIU In order to facilitate these operations a manual bypass flushing valve is available code 789110 N B In...

Page 7: ...pipe To tighten the nuts apply maximum tightening torque of 25 Nm taking account of the indications of the heat meter manufacturer install the flow probe in the M10 pocket B Please refer to the heat m...

Page 8: ...directed toward the exterior of the HIU using the pathways provided in the insulation and on the frame All the low voltage lines must be routed through a single dedicated cable raceway using the path...

Page 9: ...necessary restore the pre charge value shown in the technical specifications Filling the user system SATK32 series HIU can be fitted with a charging unit equipped with a backflow preventer F check va...

Page 10: ...ng modes OFF DHW only summer mode Heating DHW winter mode Heating only Selecting set points current time and comfort function Press the set key repeatedly to set the current time set point temperature...

Page 11: ...arious parameters which can then be edited pressing and rotating knob R Technical parameter t00 Primary limit set return temperature in heating mode Primary limit set return temperature in DHW mode Co...

Page 12: ...ng To set the flow temperature press the SET key until the symbol in the red circle appears for the return temperature limit press the key until the symbols in the green circle are displayed Use the R...

Page 13: ...7 1 freezes the operating set points to prevent inadvertent modifications by the user The comfort function can be alternatively preheating of the DHW plate heat exchanger or management of DHW recircul...

Page 14: ...posed by controlling the maximum opening of the primary circuit modulating valve Since latter is controlled by a differential pressure limiter it is possible to supply direct correspondence between th...

Page 15: ...es a sequence of LEDs showing the instantaneous power consumption 1 yellow LED lit power between 0 and 25 of Pmax 2 yellow LEDs lit power between 25 and 50 of Pmax 3 yellow LEDs lit power between 50 a...

Page 16: ...must be set to 1 2 4 7 This value t05 7 is set by default example 2 Distinction of consumption for DHW production from total consumption in combination with heat meter equipped with dedicated function...

Page 17: ...ire twisted cable Compliance with this requirement becomes even more significant the more extensive the RS 485 network If alternatively a shielded wire is used the shield must be connected solely on t...

Page 18: ...nd disabled Any requests to run cycles not associated to the previous one will continue to run normally Heating flow probe fault Error code 5 Domestic hot water probe fault Error code 6 Return probe f...

Page 19: ...o be interfaced with controllers managing the heating and DHW production services by means of pre paid type logic The HIU interprets an open contact as credit available Closing the contact disables th...

Page 20: ...ween 0 9 and 1 2 bar Restore the pressure value if necessary Re open the shut off valves and restore secondary circuit pressure to a value between 1 3 and 1 7 bar Check for the absence of any liquid d...

Page 21: ...tuator see previous paragraph Extract the obturator unscrewing the locking nut F Replace the obturator screw on the locking nut F and then fit the actuator Insert the fixing clip respecting the correc...

Page 22: ...r partly clogged call qualified personnel to have it serviced modulating valve actuator faulty call qualified personnel to have it replaced DHW temperature probe cable inverted with heating probe rest...

Page 23: ...in charge of system electronic regulator not working call qualified personnel to have it replaced primary circuit flow rate insufficient contact person in charge of system centralised system not work...

Page 24: ...s external sensor prepayment auxilliary microswitch Modbus if required been carried out 15 Has the remote user interface been configured for installation on board thermostat function disabled inside t...

Reviews: