Calix ODC-80 Installation Guide
11
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2003 Calix. All Rights Reserved.
Cooling Fan Access
Lift the roof of the cabinet to access the cooling fans.
Location of roof retaining bolts
The ODC-80 roof is held in place by 3 retaining bolts at the front of the cabinet.
Procedure to open the roof of the cabinet
Step
Action
1.
Open the front and side cabinet doors to access the underside of the roof
overhang.
2.
Locate the retaining bolts in the front of the roof
overhang and remove them using a 5/16" allen wrench.
An allen wrench is provided with the cabinet.
3.
Push the front edge of the roof up until the support arm locks into place.
Summary of Contents for ODC-10
Page 1: ...Calix ODC 80 Installation Guide July 2003 Part 220 00029 Rev 11...
Page 2: ......
Page 6: ......
Page 7: ...1 Chapter Before You Begin Installing the ODC 80...
Page 8: ......
Page 23: ...2 Chapter Placing the ODC 80 on a Pad...
Page 24: ......
Page 30: ......
Page 31: ...3 Chapter Installing Power Subscriber Cables and Equipment...
Page 32: ......
Page 74: ......
Page 75: ...4 Chapter Maintaining and Troubleshooting the ODC 80...
Page 76: ......
Page 80: ......
Page 92: ......
Page 103: ...5 Chapter Reference...
Page 104: ......
Page 106: ......