Procedure to test the batteries and recharging system
Procedure to finish the battery installation
Step
Action
1.
In the battery compartment, set all battery breakers to ON.
2.
At the AC Load center, set the Main breaker to ON.
3.
Using a volt meter, test the rectifier output to the batteries.
a. place the red volt meter lead on the red negative battery lead
b. place the black volt meter lead on the black positive battery lead
c. verify that the volt meter reads at least 52 VDC
4.
At the AC load center, set the Main breaker to OFF to check that the
batteries supply power to the cabinet. The fan trays in the Calix C7 should
continue to run.
5.
At the AC load center, set the Main breaker to ON.
Step
Action
1.
Place the battery covers on all battery trays and close the battery drawers.
2.
Close the front battery compartment.
See the procedure to close battery compartment.
Summary of Contents for ODC-10
Page 1: ...Calix ODC 80 Installation Guide July 2003 Part 220 00029 Rev 11...
Page 2: ......
Page 6: ......
Page 7: ...1 Chapter Before You Begin Installing the ODC 80...
Page 8: ......
Page 23: ...2 Chapter Placing the ODC 80 on a Pad...
Page 24: ......
Page 30: ......
Page 31: ...3 Chapter Installing Power Subscriber Cables and Equipment...
Page 32: ......
Page 74: ......
Page 75: ...4 Chapter Maintaining and Troubleshooting the ODC 80...
Page 76: ......
Page 80: ......
Page 92: ......
Page 103: ...5 Chapter Reference...
Page 104: ......
Page 106: ......