background image

Page 2

Page 3

CONTENTS

INTRODUCTION

Thank you for purchasing a Calomax Quasar 2 boiler. All our products 
are designed to give years of simple, reliable operation. To ensure 
this, it is important that the installation and subsequent servicing is 
carried out by a suitably qualified engineer in accordance with these 
instructions.

INTRODUCTION    

 

 

 

   

3

CHECK LIST 

 

 

 

 

 

3

APPROVALS    

 

 

 

3

CONSTRUCTION  

 

 

 

 

4

INSTALLATION

 

 

 

 

 

 

4 - 6

LOCATION  

 

 

 

 

 

4

COLD WATER INLET 

 

 

 

 

5

DIMENSIONS AND WEIGHTS  

 

 

5

VENT / OVERFLOW 

 

 

 

 

6

ELECTRICAL CONNECTIONS  

 

 

6

USER INSTRUCTIONS

 

 

 

 

 

6 - 8

SCALE  

 

 

 

 

 

7

GENERAL OPERATION  

 

 

 

8

GENERAL NOTES   

 

 

 

 

8

CLEANING  

 

 

 

 

 

8

ACCESSORIES  

 

 

 

 

9 - 10

SERVICE INSTRUCTIONS          

 

 

 

11,14 &15

EXPLODED DIAGRAM 

 

 

 

 

12 - 13

SPARE PARTS  

 

 

 

 

16 - 17

WIRING DIAGRAM  

 

 

 

 

18

TROUBLE SHOOTING 

 

 

 

 

19

MAINTENANCE AND SERVICE HISTORY   

 

20 - 22

WARRANTY 

 

 

 

 

 

23

PRODUCT SPECIFICATION    

 

24

CHECK LIST

Before commencing installation, check that the following parts have 
been supplied with the boiler:

1.  WRAS approved flexible water inlet hose suitable for 

potable water.

2.   BPDTK- plastic / stainless  free-standing drip tray

T

his product conforms to the CE marking directive 93/68/

EEC through compliance with the following standards:

 Electromagnetic Compatibility Directive
 Low Voltage Directive 73/23/EEC in accordance with:

        BS EN 60335-2-63:1993

Compliance with these standards has been confirmed through testing 
by an independent NAMAS approved body

Calomax products have been tested and found to comply with the 
requirements of the Water Supply (Water Fittings) Regulations 1999 
for England and Wales Water Bylaws 2000, Scotland and the Water 
Regulations Ireland.

APPROVALS

PAGE

Summary of Contents for QUASAR 2

Page 1: ...ND SERVICING INSTRUCTIONS Calomax Limited Lupton Avenue Leeds LS9 7DD Tel 0113 249 6681 Fax 0113 235 0358 e mail service calomax co uk www calomax co uk Please read these instructions carefully before...

Page 2: ...TROUBLE SHOOTING 19 MAINTENANCE AND SERVICE HISTORY 20 22 WARRANTY 23 PRODUCT SPECIFICATION 24 CHECK LIST Before commencing installation check that the following parts have been supplied with the boi...

Page 3: ...ve must be fitted to the supply BEFORE CONNECTING THE SUPPLY PIPE MUST BE THOROUGHLY FLUSHED OUT TO ENSURE THAT FOREIGN MATTER DOES NOT BLOCK OR ENTER THE SOLENOID VALVE The boiler must be connected t...

Page 4: ...luminated On subsequent operation of the boiler The boiler will fill and heat in cycles It will allow only a limited amount of water to enter the unit at any one time and then switch off the solenoid...

Page 5: ...suitably qualified engineer GENERAL NOTES GENERAL OPERATION Avoid using any abrasive materials Wiping the outer casing with a damp cloth should be sufficient Some stainless steel cleaning products may...

Page 6: ...not rectify the problem turn off the water supply and remove the flexible hose to check for debris in the valve s filter The unit can be used normally while the service indicator is flashing a 4x puls...

Page 7: ...equired are not identified please contact Calomax Limited Includes nuts washers etc Exploded parts view for Quasar 2 boiler To be read in conjunction with the spare parts list Body cut away to show in...

Page 8: ...tight joint Damage to the unit caused by a poor lid seal is not covered by warranty Scale deposits should be removed from all internal surfaces particularly the heating element thermistor and level s...

Page 9: ...DPBK NB15BLG CASSV CAP330 NBE3HK FIH CASMR CASLPK NBPRG MULLER DISPENSE VALVE GROMMET DISPENSE VALVE SERVICE KIT MAIN PRINTED CIRCUIT BOARD Inc TRIAC WATER DISPENSE PUSH BUTTON Inc FITTING TOOL AUXIL...

Page 10: ...place as required Lower operating temperature Replace element Replace Circuit Board Triac sold as a matched pair Overflows Dirt in solenoid valve Level sensors require de scaling or replacing Main Pri...

Page 11: ...Page 20 Page 21 MAINTENANCE AND SERVICE HISTORY MAINTENANCE AND SERVICE HISTORY...

Page 12: ...s are beyond our control and would invalidate the warranty offered These include Incorrect installation High Low water pressure Incorrect voltage supply Accidental damage Limescale build up The last i...

Page 13: ...ate from dispense valve 2 8 Litres Minute Voltage 220 240 V ac 50 60 Hz Power rating 3kW MAX PLEASE ENTER SERIAL NUMBER FOR FUTURE REFERENCE Note All measurements are approximate PLEASECONTACTOURSERVI...

Reviews: