Page 2
Page 3
CONTENTS
INTRODUCTION
Thank you for purchasing a Calomax Quasar 2 boiler. All our products
are designed to give years of simple, reliable operation. To ensure
this, it is important that the installation and subsequent servicing is
carried out by a suitably qualified engineer in accordance with these
instructions.
INTRODUCTION
3
CHECK LIST
3
APPROVALS
3
CONSTRUCTION
4
INSTALLATION
4 - 6
LOCATION
4
COLD WATER INLET
5
DIMENSIONS AND WEIGHTS
5
VENT / OVERFLOW
6
ELECTRICAL CONNECTIONS
6
USER INSTRUCTIONS
6 - 8
SCALE
7
GENERAL OPERATION
8
GENERAL NOTES
8
CLEANING
8
ACCESSORIES
9 - 10
SERVICE INSTRUCTIONS
11,14 &15
EXPLODED DIAGRAM
12 - 13
SPARE PARTS
16 - 17
WIRING DIAGRAM
18
TROUBLE SHOOTING
19
MAINTENANCE AND SERVICE HISTORY
20 - 22
WARRANTY
23
PRODUCT SPECIFICATION
24
CHECK LIST
Before commencing installation, check that the following parts have
been supplied with the boiler:
1. WRAS approved flexible water inlet hose suitable for
potable water.
2. BPDTK- plastic / stainless free-standing drip tray
T
his product conforms to the CE marking directive 93/68/
EEC through compliance with the following standards:
Electromagnetic Compatibility Directive
Low Voltage Directive 73/23/EEC in accordance with:
BS EN 60335-2-63:1993
Compliance with these standards has been confirmed through testing
by an independent NAMAS approved body
Calomax products have been tested and found to comply with the
requirements of the Water Supply (Water Fittings) Regulations 1999
for England and Wales Water Bylaws 2000, Scotland and the Water
Regulations Ireland.
APPROVALS
PAGE