1002594 ISSUE 1 M172 VARIHEAT
3.0 INSTALLATION
Installation summary
The Variheat is a fully packaged system, supplied as a single piece, ready for
positioning and connection to services. The Variheat is designed to be installed
in an internal plant room.
Unloading and unpacking
On arrival, check the condition of the Variheat and that the controls, duct
connections and pipe connections are in the positions ordered. Report any
concerns to your supplier prior to installation.
Items included with Variheat
User/Installation manual
Warranty registration card
Touchscreen removal adapter
Pool pipework adapters:
1in thredded to 1in solvent
1"F to 1½"M
1inF to 50mmF
Positioning
The Variheat must be kept upright at all times. If lifting with a crane, spreader
bars should be used to protect the top of the cabinet from crushing.
Ensure access to controls, service access panels and connections for users and
service engineers.
Removing the fan module
In order to factory test the Variheat, it will be supplied complete, but if
necessary, the fan module (and fresh air module, where fitted) may be
separated to assist positioning where plantroom access is restricted. The
following actions need to be completed:
Disconnect flexible LPHW hoses
Disconnect fan wiring, taking care to record all wire positions
Unbolt fan module
Unbolt fresh air module, if fitted, if required
Take appropriate care when moving the modules, which are very heavy,
particulary the refrigeration module. Ensure suitable lifting equipment is available
for the movements required.
Ensure all sections remain upright during positioning. To reconnect after
positioning, reverse the actions listed above.
Summary of connections and services
Ductwork
Return air, from pool hall
Supply air, to pool hall
Exhaust air, to atmosphere (if fresh air module, or negative pressure
module fitted)
Fresh air, from atmosphere (if fresh air module fitted)
Plumbing
Pool water circuit, flow and return
LPHW system, flow and return
Condensate drain
Electrical
Power supply
Remote interfaces (if required)
Terminals
Network connection
BMS connections
After installation
Pre-commissioning checklist
Initial start-up
Commissioning
Operator handover
Ongoing maintenance
The Variheat has been designed to operate continuously over a long service life.
Preventative maintenance is essential to keep the system operating effectively
and efficiently.