ADC 2
Instruction Manual, November 2016
Page 6
2.
Installation
2.1.
Instrument
Observe the environmental requirements (2.2 Installation envi-
ronment) when setting up the instrument.
Carefully unpack all components and accessories listed on the
shipping list from the upper part of the packing. Make sure
the shipment is complete.
Remove the instrument carefully from the package and place it
on a table.
Attention:
Do not pull out the instrument by holding it at the
blue top-cover, hold the instrument at the bottom when tak-
ing it out of the package and carrying it around!
Remove carefully the fixation under the Drying module.
For shipment, the Twin Trough Chamber has been securely
positioned below the bottom of the instrument.
Fig. 1: The ADC2 instrument
Summary of Contents for ADC 2
Page 1: ...INSTRUCTION MANUAL ADC 2 ...
Page 41: ......