Unpacking/Installation
Instruction manual ATS4, Mar-16
9
•
Do not place the instrument near equipment that generates intense magnetic fields
such as electric welding equipment, high frequency furnaces, pole transformers,
etc.
•
Protect the instrument from excessive dust.
•
Connect the instrument to power lines that are free from sudden changes or
voltage fluctuations.
•
If you must use power motor driven equipment (such as a stirrer or shaker) in the
same line as your instrument, ensure that a noise reduction unit is in the respective
power line.
Confirm that the following requirements exist before installing the instrument:
Power supply and ground
Line voltage:
85 – 250VAC (see rating plate on instrument).
Frequency:
47 – 63 Hz
Power capacity: 60 VA
A grounded outlet should be within 2 meters of the instrument.
N2 or compressed air ¼” connection
Required pressure
4.5 - 6 bar (65-87 psi)
Gas consumption
0.2 - 0.3 L/min (spotwise)
0.8 - 2.0 L/min (bandwise)
2.3
Installation
Rinsing bottles
The rear of the instrument features a compartment for the rinsing bottle and the waste
bottle. Screw the proper lid to the corresponding bottle and place the bottle into the
compartment’s designated recess.
The waste bottle (three tubes) goes into the left position and the rinsing bottle (two tubes)
into the right position.
Fill the rinsing bottle with an appropriate solvent.
Summary of Contents for ATS 4
Page 1: ...INSTRUCTION MANUAL AUTOMATIC TLC SAMPLER 4...
Page 31: ......