Unpacking/Installation
Instruction Manual, Sep-18
16
7
IN+
Opto 1; LCMS Ready
(LC/MS is ready)
8
IN- (GND)
9
IN+
Opto 2; Start NxtExtr
(DBS-MS500 can start next extraction)
10
IN- (GND)
11
+24V
Power
12
GND
Power
Table 1: Contact closure connector
Legend:
NC = normally closed
NO = normally open
IN+ = optical input positive (24V)
IN- = optical input ground (GND)
•
Connect the power cord (use only the original delivered CAMAG power cord)
•
Connect the LAN cable to the computer (for use of CHRONOS software)
•
Switch on the unit
2.5
Priming
Prior to first use or after a longer period of non-using the instrument, the fluidic has to be
filled with the respective solvents (Priming).
Priming of extraction circuit
•
Choose “Manual”
•
Choose “Extractor”
•
For the extraction pump (Prime EX):
If the system was completely empty, priming can take up to 50 cycles
•
For the rinsing pump (Prime Ri): Activate the pump for about 60 sec.
If the system was completely empty, priming can take up to 5 min.
Summary of Contents for DBS-MS 500
Page 1: ...INSTRUCTION MANUAL DBS MS 500...
Page 40: ......