Maintenance and Service
Instruction Manual, Feb-17
11
•
Clean the instrument with a lint free cloth
4.3
User maintenance
Regular check/maintenance (at least every 3 months) by the user is strongly
recommended.
User maintenance procedure:
•
Check the capillaries
•
Check the 6 port valve for signs of leakage
•
Clean the instrument with a lint free cloth
•
Replace the respective parts as outlined in chapter “Maintenance Data Sheet”
4.4
Maintenance Data Sheet
Purpose
The maintenance data sheet informs about maintenance interval of the
respective instrument as well as the proposal for IQ/OQ interval if
applicable. In addition, it identifies parts subject to wear with the
respective replacement cycle and CAMAG order number.
Maintenance interval
Maintenance
12 month
IQ/OQ
12 month
Consumable parts
Part No.
Description
Replacement cycle
370.0002
2 Batteries 1.5V AA size
36 months/100h
022.8450
In-line frit
6 months/depends on usage
115.8448
Elution head, round 4mm h=
0.25mm
36 months/if leakage is
detected
115.8446
Elution head, oval 4x2 mm
h=0.25mm
36 months/if leakage is
detected
941.0040
Waste filter for cleaning sledge
36 months
660.0040
O-ring for waste container
36 months
Rotor seal for 6 port valve
36 months/if leakage is
detected or the pressure in
the system is too high
Summary of Contents for TLC-MS INTERFACE 2
Page 1: ...INSTRUCTION MANUAL TLC MS INTERFACE 2...
Page 27: ......