Chapter 5: Preparing for installation
Preparing for installation
Page 5-5
Preparing for installation
ODU pre-configuration
It is common practice to pre-configure the units during staging before site installation by
performing the following tasks:
Connecting to the unit
Configuring IP and Ethernet interfaces
Upgrading the software version and using CNUT
General configuration
Configuring security
Configuring radio parameters
Setting up SNMP agent
Configuring syslog
Configuring remote access
Monitoring the Link
Configuring quality of service
Zero Touch Configuration Using DHCP Option 66
Configuring Radio via config file
Configuring a RADIUS server
If the units are to be pre-configured during staging, the safety precautions below MUST be
observed.
Preparing personnel
In no event shall Cambium Networks be liable for any injury or damage caused during the
installation of the Cambium 450 Platform Family ODU.
Ensure that only qualified personnel undertake the installation of a 450 Platform system.
Ensure that all safety precautions are observed.
Preparing inventory
Perform the following inventory checks:
Check that the correct components are available, as described in
Ordering the components
on
page
2-54.
Check the contents of all packages against their packing lists.
Summary of Contents for PMP 450 Series
Page 125: ...Chapter 3 System planning Typical deployment Page 3 3 Figure 37 Wall installation...
Page 126: ...Chapter 3 System planning Typical deployment Page 3 4 Figure 38 Roof installation...
Page 127: ...Chapter 3 System planning Typical deployment Page 3 5 Figure 39 GPS receiver wall installation...