PMP 450 Planning Guide
Protection requirements for a mast or tower installation
If the AP or SM is to be mounted on a metal tower or mast, then in addition to the general protection requirements
(above), the following requirements must be observed:
•
The equipment must be lower than the top of the tower or its lightning air terminal.
•
The metal tower or mast must be correctly grounded.
•
A grounding kit must
be installed at the first point of contact between the drop cable and the tower, near the
top.
•
A grounding kit must be installed at the bottom of the tower, near the vertical to horizontal transition point.
This grounding kit must
be bonded to the tower or tower ground bus bar (TGB), if installed.
Schematic examples of mast or tower installations are shown in
Figure 24 Grounding and lightning protection on mast or tower
Error! No topic specified.
1-110
pmp-0047 (March 2014)
Summary of Contents for PMP 450
Page 1: ...Cambium PMP 450 Planning Guide System Release 13 1 ...
Page 13: ...PMP 450 Planning Guide pmp 0047 March 2014 1 3 ...
Page 42: ...PMP 450 Planning Guide Figure 14 Custom Frequency tab of the SM 1 32 pmp 0047 March 2014 ...
Page 58: ...PMP 450 Planning Guide Figure 16 AP web based management screenshot 1 48 pmp 0047 March 2014 ...
Page 82: ...PMP 450 Planning Guide 1 72 pmp 0047 March 2014 ...
Page 155: ...PMP 450 Planning Guide pmp 0047 March 2014 1 145 ...