Chapter 3:
System planning
This chapter provides information to help the user to plan a PTP 650 link.
The following topics are described in this chapter:
•
contains diagrams illustrating typical PTP 650 site
deployments.
•
describes factors to be considered when planning the proposed link
end sites, including grounding, lightning protection and equipment location.
•
describes how to plan PTP 650 links to conform to the
regulatory restrictions that apply in the country of operation.
•
describes factors to be taken into account when planning links,
such as range, path loss and throughput.
•
Planning for connectorized units
describes factors to be taken into account when
planning to use connectorized ODUs with external antennas in PTP 650 links.
•
describes factors to be considered when planning PTP 650
data networks.
•
describes how to plan for PTP 650 links to be
managed remotely using SNMP.
•
describes how to plan for PTP 650 links to operate in secure
mode.
•
System threshold, output power and link loss
contains tables that specify the
system threshold (dBm), output power (dBm) and maximum link loss (dB) per channel
bandwidth and modulation mode.
•
Data throughput capacity tables
contains tables and graphs to support
calculation of the data rate capacity that can be provided by PTP 650 configurations.
Page
3-1