Page 20
UNDER DEVELOPMENT
Connecting a drop cable to the ODU and LPU
Connect an EMC strain relief cable gland and RJ45 connector to the ODU and LPU.
1 Plug the RJ45 connector into the socket in the unit, ensuring that it snaps home:
2 Fit the gland body to the ODU or LPU port and tighten it to a torque of 5.5 Nm (4.3 lb ft):
3 Fit the gland nut and tighten until the rubber seal closes on the cable: