Preparing for inst allat ion
Chapt er 5: I nst allat ion
5- 4
phn- 2513_004v000 ( Oct 2012)
Equ ip m e n t t o be I n st a lle d
Tools Re q u ir e d
Coupler
6mm Allen key
2.5mm and 3mm Allen keys (supplied)
Lubricant (supplied)
Antenna
17mm spanner
7 mm spanner (for tapered transition)
Voltmeter and BNC lead
Compass and GPS meter
Cable
Cable cutters
Cable hoist
Flat file to dress the cable inner core
Wire brush to comb the braid
Crimp tool Cambium part 66010063001
Torque wrench
Unit pre-configuration
To pre-configure the CMUs during staging before site installation (if this is required),
follow this process:
1
Perform the following tasks from
each CMU:
Task 1: Connecting to the unit
on page
Task 11: Configuring remote access
2
Install and test the new hardware by following the relevant procedures in this
chapter.
3
Align the antennas and complete the configuration by performing the following
tasks from
from
Task 15: Connecting link to the network
Summary of Contents for PTP 800 Series
Page 1: ...Cambium PTP 800 Series User Guide System Release 800 05 02 ...
Page 40: ...Licensing requirements About This User Guide 10 phn 2513_004v000 Oct 2012 ...
Page 232: ...Limit of liability Chapter 3 Legal information 3 22 phn 2513_004v000 Oct 2012 ...
Page 322: ...Radiation hazard assessm ent Chapter 4 Reference information 4 90 phn 2513_004v000 Oct 2012 ...
Page 428: ...Replacing IRFU components Chapter 5 Installation 5 106 phn 2513_004v000 Oct 2012 ...
Page 630: ...Using recovery mode Chapter 7 Operation 7 78 phn 2513_004v000 Oct 2012 ...