Planning 1+ 0 links
Chapt er 2: Planning considerat ions
2- 30
phn- 2513_004v000 ( Oct 2012)
Planning 1+0 links
When planning 1+0 links, follow the process described in this section.
Concept of a 1+0 link
A 1+0 link is the simplest link to deploy. There is no redundant equipment deployed and so
costs are minimized. The 1+0 link provides no protection in the case of equipment failure.
If a link is very critical to network operation and where a service outage due to equipment
failure cannot be tolerated, consider deploying a 1+1 Hot Standby link.
Antenna, RFU and CMU configurations for 1+0
Select one of the following 1+0 link end configurations:
•
ODU with direct mount antenna (
•
ODU with remote mount antenna (
•
IRFU with remote mount antenna (
Do not install an ODU and an IRFU in the same link, as they cannot interwork.
Summary of Contents for PTP 800 Series
Page 1: ...Cambium PTP 800 Series User Guide System Release 800 05 02 ...
Page 40: ...Licensing requirements About This User Guide 10 phn 2513_004v000 Oct 2012 ...
Page 232: ...Limit of liability Chapter 3 Legal information 3 22 phn 2513_004v000 Oct 2012 ...
Page 322: ...Radiation hazard assessm ent Chapter 4 Reference information 4 90 phn 2513_004v000 Oct 2012 ...
Page 428: ...Replacing IRFU components Chapter 5 Installation 5 106 phn 2513_004v000 Oct 2012 ...
Page 630: ...Using recovery mode Chapter 7 Operation 7 78 phn 2513_004v000 Oct 2012 ...