PTP 800 Series User Guide
Preparing for inst allat ion
phn- 2513_004v000 ( Oct 2012)
5- 3
Preparing personnel
In no event shall Cambium Networks be liable for any injury or damage caused during the
installation of the Cambium PTP 800.
Ensure that only qualified personnel undertake the installation of a PTP 800 link.
Ensure that all safety precautions are observed.
Preparing inventory
Perform the following inventory checks:
•
Check that an installation report is available and that it is based on the principles
described in
•
Check that the correct components are available, as described
•
Check the contents of all packages against their packing lists.
Preparing tools
Check that the tools listed in
Ta ble 2 1 3
Tools r equired for PTP 800 inst allat ion
Equ ip m e n t t o be I n st a lle d
Tools Re q u ir e d
CMU
Pozi screw driver (PZ1)
Ground lug crimp tool (diameter 5mm)
8mm spanner
Direct Mount ODU
Lubricant (supplied)
Remote Mount
17mm spanner
Lubricant (supplied)
Flexible Wave Guide
Allen key (supplied in the kit)
Flexible Wave Guide hanger
13mm spanner
5mm Allen key
Flat bladed screw driver (6mm) or
Pozi screw driver (PZ2)
Summary of Contents for PTP 800 Series
Page 1: ...Cambium PTP 800 Series User Guide System Release 800 05 02 ...
Page 40: ...Licensing requirements About This User Guide 10 phn 2513_004v000 Oct 2012 ...
Page 232: ...Limit of liability Chapter 3 Legal information 3 22 phn 2513_004v000 Oct 2012 ...
Page 322: ...Radiation hazard assessm ent Chapter 4 Reference information 4 90 phn 2513_004v000 Oct 2012 ...
Page 428: ...Replacing IRFU components Chapter 5 Installation 5 106 phn 2513_004v000 Oct 2012 ...
Page 630: ...Using recovery mode Chapter 7 Operation 7 78 phn 2513_004v000 Oct 2012 ...