PTP 800 Series User Guide
Test ing t he ODU and I F cable
phn- 2513_004v000 ( Oct 2012)
5- 61
Figu r e 8 0
Exam ple of a cable analyzer
Test preparation
Set up the equipment to perform the pre-power tests.
this is done. In this example, there is a short length of cable from the analyzer (in place of
the CMU) to the first LPU, a length of cable ‘y’ from the first LPU to the second LPU (at
the top of the tower) and a short length of cable from the second LPU to the ODU (0.7m
long supplied in the accessory kit).
Figu r e 8 1
Exam ple of t he cable t est
Perform these tests in conjunction with the test equipment manufacturer’s instructions.
Summary of Contents for PTP 800 Series
Page 1: ...Cambium PTP 800 Series User Guide System Release 800 05 02 ...
Page 40: ...Licensing requirements About This User Guide 10 phn 2513_004v000 Oct 2012 ...
Page 232: ...Limit of liability Chapter 3 Legal information 3 22 phn 2513_004v000 Oct 2012 ...
Page 322: ...Radiation hazard assessm ent Chapter 4 Reference information 4 90 phn 2513_004v000 Oct 2012 ...
Page 428: ...Replacing IRFU components Chapter 5 Installation 5 106 phn 2513_004v000 Oct 2012 ...
Page 630: ...Using recovery mode Chapter 7 Operation 7 78 phn 2513_004v000 Oct 2012 ...