Preparing net work connect ions ( 1+ 0 and 2+ 0 links)
Chapt er 5: I nst allat ion
5- 84
phn- 2513_004v000 ( Oct 2012)
Preparing network connections (1+0 and 2+0 links)
This section describes how to prepare the cables to connect the CMU to router ports,
switch ports or other equipment in the customer and (optionally) management networks. It
applies only to unprotected ends (1+0 and 2+0 links).
When installing a 2+0 link, prepare separate network connections for the link ‘A’ and the
link ‘B’ CMUs.
The CMU is not normally connected to the network equipment until antenna alignment is
complete (as described in
Task 15: Connecting link to the network
For all management modes (out-of-band and in-band), decide whether the data network
connection is to be copper or fiber, then perform either
Installing a copper data interface
Installing a fiber data interface
on page
For out-of-band management modes (but not in-band), perform
Summary of Contents for PTP 800 Series
Page 1: ...Cambium PTP 800 Series User Guide System Release 800 05 02 ...
Page 40: ...Licensing requirements About This User Guide 10 phn 2513_004v000 Oct 2012 ...
Page 232: ...Limit of liability Chapter 3 Legal information 3 22 phn 2513_004v000 Oct 2012 ...
Page 322: ...Radiation hazard assessm ent Chapter 4 Reference information 4 90 phn 2513_004v000 Oct 2012 ...
Page 428: ...Replacing IRFU components Chapter 5 Installation 5 106 phn 2513_004v000 Oct 2012 ...
Page 630: ...Using recovery mode Chapter 7 Operation 7 78 phn 2513_004v000 Oct 2012 ...