Task 2: Configuring I P and Et hernet int erfaces
Chapt er 6: Configurat ion and alignm ent
6- 8
phn- 2513_004v000 ( Oct 2012)
Task 2: Configuring IP and Ethernet interfaces
This task consists of the following procedures:
•
Managing the units during configuration and alignment
•
Configuring the IP interface and management mode
•
Reconnecting to the management PC
Managing the units during configuration and alignment
Choose the best way to manage the PTP 800 units during the configuration and alignment
process.
Out-of-band management
Where out-of-band management is chosen, the management port is active and a PC can be
locally connected. Once the wireless link is operational, the remote PTP 800 unit may also
be accessed across the wireless link.
In a 1+1 Hot Standby link with out-of-band management, connect to both PTP 800s in one
of the following ways:
•
Locally from the Ethernet port of the protection splitter
•
From a PC connected to a local switch where routing and connectivity exist for
accessing the Ethernet port of the protection splitter.
•
Before the protection splitter is installed, locally from the management port.
Summary of Contents for PTP 800 Series
Page 1: ...Cambium PTP 800 Series User Guide System Release 800 05 02 ...
Page 40: ...Licensing requirements About This User Guide 10 phn 2513_004v000 Oct 2012 ...
Page 232: ...Limit of liability Chapter 3 Legal information 3 22 phn 2513_004v000 Oct 2012 ...
Page 322: ...Radiation hazard assessm ent Chapter 4 Reference information 4 90 phn 2513_004v000 Oct 2012 ...
Page 428: ...Replacing IRFU components Chapter 5 Installation 5 106 phn 2513_004v000 Oct 2012 ...
Page 630: ...Using recovery mode Chapter 7 Operation 7 78 phn 2513_004v000 Oct 2012 ...