Managing perform ance
Chapt er 7: Operat ion
7- 66
phn- 2513_004v000 ( Oct 2012)
Maintaining the system
Once installed, a PTP 800 link should require little or no maintenance.
Yearly maintenance
Recommended yearly physical maintenance:
•
Check cables for corrosion, chafing etc.
•
Check waterproofing.
•
Check ground points for corrosion, tightness etc.
Monthly maintenance
Recommended monthly radio maintenance:
•
Read Link Loss and compare against last reading.
•
Read ByteER and compare against last reading.
1+1 Hot Standby link maintenance
For a 1+1 Hot Standby link, consider a controlled switchover to the inactive unit (once
every three months), to confirm that it is fully functional.
This can cause a short interruption to traffic and should be scheduled accordingly to
minimize the effects.
Summary of Contents for PTP 800 Series
Page 1: ...Cambium PTP 800 Series User Guide System Release 800 05 02 ...
Page 40: ...Licensing requirements About This User Guide 10 phn 2513_004v000 Oct 2012 ...
Page 232: ...Limit of liability Chapter 3 Legal information 3 22 phn 2513_004v000 Oct 2012 ...
Page 322: ...Radiation hazard assessm ent Chapter 4 Reference information 4 90 phn 2513_004v000 Oct 2012 ...
Page 428: ...Replacing IRFU components Chapter 5 Installation 5 106 phn 2513_004v000 Oct 2012 ...
Page 630: ...Using recovery mode Chapter 7 Operation 7 78 phn 2513_004v000 Oct 2012 ...