background image

Page 14 of 16 

 

Installing the Activation Key 

New  PTP 820E  units are delivered with a default activation key that enables you to manage and configure the unit. 
Additional feature and capacity support requires you to enter an activation key cipher in the Activation Key Configuration 
page. Contact your vendor to obtain your activation key cipher.  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

If the activation-key-enabled capacity and feature set is exceeded, an Activation Key Violation alarm occurs and the Web 
EMS displays a yellow background and an activation key violation warning. After a 48-hour grace period, all other alarms 
are hidden until the capacity and features in use are brought within the activation key’s capacity and feature set. 

Demo mode is available, which enables all features for 60 days. When demo mode expires, the most recent valid activation 
key goes into effect.  

To enter a new activation key, select Platform > Activation Key > Activation Key Configuration. The Activation Key 
Configuration page opens. 

 

 

Enter the activation 

key cipher here 

and click 

Apply

.

To activate Demo mode, 

select 

Enable 

here and 

click 

Apply

.

Displays the number of 

hours that remain before 

demo mode expires.

Summary of Contents for PTP 820E

Page 1: ...Quick Installation Instructions PTP 820E System Release 10 9 ...

Page 2: ...terial Accordingly any copyrighted material of Cambium its licensors or the 3rd Party software supplied material contained in the Cambium products described in this document may not be copied reproduced reverse engineered distributed merged or modified in any manner without the express written permission of Cambium Furthermore the purchase of Cambium products shall not be deemed to grant either di...

Page 3: ...ore detailed instructions Installation Guide for PTP 820E Detailed instructions for hardware assembly of all supported PTP 820E link types User Guide for PTP 820C PTP 820S and PTP 820E Detailed instructions for software configuration PTP 820E Rear View Left and Front View Right PTP 820E Interfaces Cable Gland Construction ...

Page 4: ...Page 4 of 16 PoE Injector PoE Injector Interfaces ...

Page 5: ...e the transparent pressure window located on the antenna interface For horizontal polarization locate the twist with the letter H at 3 o clock and fasten the two screws For vertical polarization locate the twist with the letter V at 3 o clock and fasten the two screws ...

Page 6: ...ntenna using the four M8 captive screws and washers that are supplied assembled in the PTP 820E and tighten the screws When tightening the captive screws use 20 Nm torque In order to avoid misalignment screws should be tightened progressively ...

Page 7: ...Page 7 of 16 Cabling To connect an optical Ethernet cable and SFP ...

Page 8: ...Page 8 of 16 To connect an electrical Ethernet cable To connect a DC power cable ...

Page 9: ...No grounding is required for optical SFP cables External shielded CAT5E cable should be grounded to the antenna tower at the top next to the PTP 820 unit and the bottom of the external run and every 50m using the kit CAT5E_gnd_kit ...

Page 10: ...nt and tighten the PoE Injector to a wall using two M6 bolts and anchors Use Anchor Stainless Steel with flanged Hexagonal nut M6X70 1 2 Drill two 6mm diameter holes with 100mm between the center of the holes Insert the anchors with the bolts place the washers on the bolts and tighten the nuts 3 ...

Page 11: ...the adaptor through the wall mounting holes using M6 screws and washers 4 2 Connect ETSI adapting ears to a 19 rack adaptor using four M6 screws Mount the 19 rack adaptor with the ETSI ears on the ETSI rack using four M6 screws and cage nuts To ground a PoE Injector 1 On the right side of the PoE Injector loosen the screw plain washer and serrated washer 2 Place the cable lug supplied with the PoE...

Page 12: ...cordance with applicable national code and regulations rated maximum 20A shall be installed for full power disconnection in a building installation Any outdoor antenna cable shield shall be permanently connected to protective earth in a building installation Connecting to the Unit 1 Connect your laptops LAN port to the MGT port on the PTP 820E 2 Configure an IP address on the laptop within the sam...

Page 13: ...e opens Select IPv4 or IPv6 The unit will use the selected protocol when initiating communications Description of unit optional You can enter an IP address in IPv4 format use the IP address field or IPv6 format use the IPv6 Address field Before configuring the radio link ensure that both ends of the link have unique IP addresses ...

Page 14: ...ays a yellow background and an activation key violation warning After a 48 hour grace period all other alarms are hidden until the capacity and features in use are brought within the activation key s capacity and feature set Demo mode is available which enables all features for 60 days When demo mode expires the most recent valid activation key goes into effect To enter a new activation key select...

Page 15: ...ional Mode field enter the maximum and minimum profiles for the script in these fields Fixed ACM mode applies constant TX and RX rates In Adaptive ACM mode TX and RX rates are dynamic An ACM enabled radio system automatically chooses which profile to use according to channel fading conditions Select Yes to configure in band management or No if you do not need in band management If you selected Yes...

Page 16: ... the voltage measured at the BNC port is not accurate and should be used only as an aid Verify that the Radio Bit Error Rate BER is 10E 11 or higher If working with ATPC verify that ATPC is operating as expected RSL reference level To display the BER using the Web EMS go to the Aggregate PM report Radio PM Statistics Aggregate To display the current RSL RX using the Web EMS go to the Radio Paramet...

Reviews: