8.
Connect the fibers to the SFP transceiver. Listen for the “click” to ensure that they
are fully inserted.
9.
Remove the tie wrap securing the cable to the gland.
Note
A new tie wrap must be used to secure the cable to the gland at the end of the
procedure, as described in Step 13.
10.
Connect the connector into the PTP 850E connector.