CLEAN AIR MANAGEMENT COMPANY, INC.
8224 Nieman Road
i
Lenexa, Kansas 66214 Phone: 913-831-0740 Fax: 913-831-9271
START-UP CHECKLIST
1. Installation
Make sure the unit is secured to grade. The ladder(s) and platform(s) must be
tightened and set up according to OSHA requirements. Ducting and piping must
be secured and routed out of the way of traffic whenever possible to avoid injury.
Ducting must also be free of all debris including moisture.
2. Interior of the dirty air plenum
A. Make sure that the filter bag assemblies hang straight and the bottoms do
not
touch each other or any part of the collector interior. If this occurs, the bags
will have holes worn in them wherever they contact and will require
replacement.
B. High-level alarms should be connected sufficiently below the air inlet(s) to
avoid a plugged up inlet or blinded off filter bags.
3. Clean air plenum
A. Properly install weights onto Weight Relief valve the end of the tank
assembly.
B. All bolts on the flanges must be in place and properly tighten.
C. Verify that the pulse arm drive is properly installed.
D. Note: Gear Reducers are shipped without oil. Reference attached Manual for
proper level.
4. Positive Displacement Pump
A. All supply air lines must be clean internally before connecting to blower.
B. Verify Inlet filter is properly installed.
C. Verify V-belt alignment and tension.
D. Note: PD pump is shipped without oil. Reference attached Manual for
proper level.
E. Verify proper rotation.
7-1