background image

p. 

3

 - Manual 

FA01338-EN

  - 01/2020 - © C

AME S.p.A. - The contents of this manual may be changed at any time and without notice. - T

ranslation of the o

riginal instructions

GENERAL PRECAUTIONS FOR INSTALLERS

 Important safety instructions.

 Please follow all of these instructions. Improper installation may cause serious bodily harm.

 Before continuing, please also read the general precautions for users.

Only use this product for its intended purpose. Any other use is hazardous. • The manufacturer cannot be held liable for 
any damage caused by improper, unreasonable or erroneous use. • This product is defined by the Machinery Directive 
(2006/42/EC) as partly completed machinery. • Partly completed machinery means an assembly which is almost 
machinery but which cannot in itself perform a specific application. • Partly completed machinery is only intended to be 
incorporated into or assembled with other machinery or other partly completed machinery or equipment thereby forming 
machinery to which the Machinery Directive (2006/42/EC) applies. • The final installation must comply with the Machinery 
Directive (2006/42/EC) and the European reference standards in force. • The manufacturer declines any liability for using 
non-original products, which would also void the warranty. • All operations indicated in this manual must be carried out 
exclusively by skilled and qualified personnel and in full compliance with the regulations in force. • The device must be 
installed, wired, connected and tested according to good professional practice, in compliance with the standards and laws 
in force. • All the components (e.g. actuators, photocells and sensitive edges) needed for the final installation to comply 
with the Machinery Directive (2006/42/EC) and with the reference harmonised technical standards are specified in the 
general CAME product catalogue or on the website www.came.com. • Make sure the mains power supply is disconnected 
during all installation procedures. • Check that the temperature ranges given are suitable for the installation site. • The 
appliance must be powered with a voltage corresponding to the value shown on the rating plate. Power must be supplied 
through a very low safety voltage system. • Do not install the operator on surfaces that could yield and bend. If necessary, 
add suitable reinforcements to the anchoring points. • Make sure that no direct jets of water can wet the product at the 
installation site (sprinklers, water cleaners, etc.). • Make sure you have set up a suitable dual-pole cut-off device along 
the power supply that is compliant with the installation rules. It should completely cut off the power supply according to 
category III surcharge conditions. • Demarcate the entire site properly to prevent unauthorised personnel from entering, 
especially minors. • In case of manual handling, have one person for every 20 kg that needs hoisting; for non-manual 
handling, use proper hoisting equipment in safe conditions. • Use suitable protection to prevent any mechanical hazards 
due to persons loitering within the operating range of the operator. • The electrical cables must pass through special pipes, 
ducts and cable glands in order to guarantee adequate protection against mechanical damage. • The electrical cables 
must not touch any parts that may overheat during use (such as the motor and transformer). • Before installation, check 
that the guided part is in good mechanical condition, and that it opens and closes correctly. • The product cannot be used 
to automate any guided part that includes a pedestrian gate, unless it can only be enabled when the pedestrian gate is 
secured. • Make sure that nobody can become trapped between the guided and fixed parts, when the guided part is set in 
motion. • All fixed controls must be clearly visible after installation, in a position that allows the guided part to be directly 
visible, but far away from moving parts. In the case of a hold-to-run control, this must be installed at a minimum height 
of 1.5 m from the ground and must not be accessible to the public. • If not already present, apply a permanent tag that 
describes how to use the manual release mechanism close to it. • Make sure that the operator has been properly adjusted 
and that the safety and protection devices and the manual release are working properly. • Before handing over to the final 
user, check that the system complies with the harmonised standards and the essential requirements of the Machinery 
Directive (2006/42/EC). • Any residual risks must be indicated clearly with proper signage affixed in visible areas, and 
explained to end users. • Put the machine’s ID plate in a visible place when the installation is complete. • If the power-
supply cable is damaged, it must be immediately replaced by the manufacturer or by an authorised technical assistance 
centre, or in any case, by qualified staff, to prevent any risk. • Keep this manual inside the technical folder along with 
the manuals of all the other devices used for your automation system. • Make sure to hand over to the end user all the 
operating manuals of the products that make up the final machinery.

Summary of Contents for ATS30DGR

Page 1: ...Gearmotor for swing gates ATS30DGS ATS50DGS ATS30DGR INSTALLATION MANUAL FA01338 EN EN English ...

Page 2: ...1 2 3 1 2 3 4 ...

Page 3: ...tc Make sure you have set up a suitable dual pole cut off device along the power supply that is compliant with the installation rules It should completely cut off the power supply according to category III surcharge conditions Demarcate the entire site properly to prevent unauthorised personnel from entering especially minors In case of manual handling have one person for every 20 kg that needs ho...

Page 4: ...tegies Simply follow these brief disposal guidelines DISPOSING OF THE PACKAGING The packaging materials cardboard plastic etc can be disposed of easily as solid urban waste separated for recycling Before dismantling and disposing of the product please always check the local laws in force DISPOSE OF THE PRODUCT RESPONSIBLY DISPOSING OF THE PRODUCT Our products are made of various materials Most of ...

Page 5: ...sible telescopic gearmotor 24 V with encoder for swing gates with Max C up to 200 mm with leaf up to 5 m and 400 kg Grey RAL7024 801MP 0110 ATS30DGR Irreversible telescopic gearmotor 24 V with encoder for swing gates with Max C 200 mm with remote release for leaves up to 3 m and 400 kg Grey RAL7024 Intended use Solutions for applications in residential buildings and apartment blocks Any installati...

Page 6: ...pressure level dB A 70 70 70 Protection rating IP 54 54 54 Insulation class I I I Reduction ratio i 28 28 28 Weight kg 7 5 8 7 5 Cable types and minimum thicknesses Cable length m up to 20 from 20 to 30 Motor with encoder power supply 24 V DC 4G x 1 5 mm 4G x 2 5 mm When operating at 230 V and outdoors use H05RN F cables compliant with 60245 IEC 57 IEC when operating indoors use H05VV F cables com...

Page 7: ...or fitting the operator and accessories varies depending on the area where it is installed It is up to the installer to find the most suitable solution The drawings refer to a gearmotor installed on the left hand side Preliminary operations Prepare the junction boxes and corrugated tubes you need for the connections from the junction pit The number of tubes depends on the type of system and the ac...

Page 8: ...eaf to 90 or 120 First determine where the gate bracket needs to be positioned then where the post bracket needs to be positioned Respect the values indicated in the table A C B 60 60 E F 5 ATS30DGS ATS30DGR Gate leaf opening A B E F Max C 90 130 130 910 1170 50 90 150 220 910 1290 150 90 120 270 890 1300 200 120 180 130 910 1300 50 ATS50DGS Gate leaf opening A B E F Max C 90 200 200 1030 1430 150...

Page 9: ...out notice Translation of the original instructions Fastening the brackets Secure the post bracket with plugs and screws The holes on the bracket fixing plate allow you to vary the opening angle of the gate leaf Fasten in place with screws or weld the bracket to the gate 100 100 75 70 80 ø 9 47 50 ø 9 ø 9 ...

Page 10: ...hanged at any time and without notice Translation of the original instructions Fastening the gearmotor Lubricate all moving parts on the operator A The self locking nut must be loosely tightened so as not to affect the movement of the telescopic arm with the gate bracket ATS30DGR ...

Page 11: ...ICAL CONNECTIONS Before working on the control panel disconnect the mains power supply and remove the batteries if any Remove the protective cover to access the terminal board A Control panel B Gearmotor delayed while opening C Gearmotor delayed while closing D 230 V AC 50 60 HZ power supply input 1 Yellow green cable M1 N1 ENC1 M N ENC M N ENC M2 N2 ENC2 B C A D ...

Page 12: ...croswitch 10 mm in either direction turn the rod 20 times Determining the opening end of travel points Release the gearmotor Open the gate manually Send an opening command At the same time turn the rod for determining the opening end of travel point CLOCKWISE until the gearmotor stops Leave the rod nut loose to determine the end of travel points Determining the closing end of travel points Release...

Page 13: ...ablishing the bracket fastening points Close the gate manually First determine where the gate bracket needs to be positioned then where the post bracket needs to be positioned Respect the values indicated in the table A Additional bracket not included 1 2 3 A B E A 5 60 A ATS30DGS ATS30DGR Gate leaf opening A B E 90 150 150 910 ATS50DGS Gate leaf opening A B E 90 200 200 1030 ...

Page 14: ...ical connections Before working on the control panel disconnect the mains power supply and remove the batteries if any Remove the protective cover to access the terminal board A Control panel B Gearmotor delayed while opening C Gearmotor delayed while closing D 230 V AC 50 60 HZ power supply input 1 Yellow green cable M1 N1 ENC1 M2 N2 ENC2 A C D M N ENC M N ENC B ...

Page 15: ...nd of travel points Release the gearmotor Open the gate manually Send an opening command At the same time turn the rod for determining the opening end of travel point ANTICLOCKWISE until the gearmotor stops Leave the rod nut loose to determine the end of travel points Determining the closing end of travel points Release the gearmotor Close the gate manually Send a closing command At the same time ...

Page 16: ...p 16 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions FINAL OPERATIONS 1 2 ...

Page 17: ...If the system is not used for long periods of time e g for installations at sites with seasonal closures disconnect the power supply When the power supply is reconnected check the system is working correctly For information on correct installation and adjustments please see the product installation manual For information on choosing products and accessories please see our product catalogue Every 2...

Page 18: ...p 18 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions ...

Page 19: ...p 19 Manual FA01338 EN 01 2020 CAME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions ...

Page 20: ...ME S p A The contents of this manual may be changed at any time and without notice Translation of the original instructions CAME S p A Via Martiri della Libertà 15 31030 Dosson di Casier Treviso Italy Tel 39 0422 4940 Fax 39 0422 4941 ...

Reviews: