p.
1
9
19
- M
an
u
al
:
F
A
0
0
6
0
5
-E
N
FA
0
0
6
0
5
-E
N
v.
1
- 0
1/
2
0
17 - © C
A
M
E S
.p.
A
. - T
h
e m
an
u
al
's c
onte
nts m
ay b
e e
d
ite
d at a
ny ti
m
e w
ith
ou
t n
oti
ce
.
MAINTENANCE
Periodic maintenance
☞
Before doing any maintenance, cut off the power supply, to prevent any hazardous situations caused by accidentally activating the operator.
Periodic maintenance log kept by users (every six months)
Date
Notes Signature
Extraordinary maintenance
⚠
The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
Any extraordinary maintenance jobs must be done only by specialized technicians.
Extraordinary maintenance log
Fitter's stamp
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed __________________________________________________________________________________________
______________________________________________________________________________________________________
_________________________________________________________________________________________________
Fitter's stamp
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed __________________________________________________________________________________________
______________________________________________________________________________________________________
_________________________________________________________________________________________________