130 min130 min
225
C
C
A
B
A
B
110°
p.
1
2
12
- M
an
u
al
c
od
e:
11
9
D
V
1
2
E
N
11
9
D
V
1
2
E
N
v.
4 - 0
1/
2
0
17 - © C
am
e S
.p.
A
. T
h
e c
onte
nts of th
is
m
an
u
al
m
ay b
e c
h
an
g
ed at a
ny ti
m
e w
ith
ou
t p
rio
r n
oti
ce
.
Installing and connections for outer opening
Following, are the only things that change compared to a standard installation:
Fastening the brackets
Establish where you will fit the gate brace and measure where the gate-post brace will fit. Make sure to respect the quotas shown in the drawing
and table.
Application dimension (mm)
Leaf opening arc (°)
A
C MAX
B
90°
150
60
420
110°
150
60
380