background image

8

STAGE 3

INSTALLATION

3.1 - Installing the Motors

Open the lock cover cap (1). Push the key in and turn clockwise (2). Raise the cover, loosen the
3.9x13 screw and remove the cover from the gearmotor unit (3).

Insert the gearmotor in the base plate, align with the 4 holes and secure it with the two M8x90 bolts
and nuts provided.

(1)

3,9x13

3,9x13

3,9x13

3,9x13

3,9x13

(1) 

(2) 

(3)

M8x90

M8x90

M8x90

M8x90

M8x90

M8

M8

M8

M8

M8

(4)

Summary of Contents for FAST KIT

Page 1: ...on kit Kit consists of 2 x fast motors 240V 1 x built in control panel 240V 1 x radio receiver 1 x tuned antenna 2 x remote control handsets 1 x pair safety photocells 1 x flashing in movement light Full installation guide FAST S Single gate automation kit Kit consists of 1 x fast motor 240V 1 x built in control panel 240V 1 x radio receiver 1 x tuned antenna 2 x remote control handsets 1 x pair s...

Page 2: ...t to a pair of gates Please read these instructions and diagrams carefully before starting any work Installation Type 1 Gear Motor Accessories 2 Control panel 3 Radio receiver 4 Antenna 5 Flashing light indicating door movement 7 Safety photocells UNDER NO CIRCUMSTANCES SHOULD THIS EQUIPMENT BE OPERATED UNLESS FITTED TO A GATE FAILURE TO COMPLY WILL INVALIDATE THE GUARANTEE ...

Page 3: ...ZF1 BOARD WITH SINGLE GATE 13 4 3 ELECTRICAL CONNECTIONS 14 5 Stage 5 Commissioning the control Panel 5 1 INITIAL WIRING CONTROL PANEL SETUP 16 5 2 OPENING CLOSING THE GATES 17 5 3 CONTROL PANEL ADJUSTMENTS 18 5 4 AUTOMATIC CLOSE SAFETY PHOTOCELLS 19 5 5 PROGRAMMING THE REMOTE CONTROLS TO THE CONTROL PANEL 20 5 6 CODING THE ADDITIONAL REMOTE 21 5 7 FINAL ASSEMBLY 22 6 Technical Information 7 1 ELE...

Page 4: ... control and safety requirements see the system type there must be a centre stop firmly secured in the ground for the gates to close onto to prevent the gate overextending Width of gate wing Weight of gate wing 1 m 300 Kg 1 5 m 250 Kg 2 m 215 Kg 2 3 m 200 Kg 194 mm 218 mm 245 mm Opening angle A B 90 137 210 0 90 137 205 50 90 137 200 75 90 137 195 100 90 137 190 125 90 137 185 150 90 137 180 175 9...

Page 5: ...threaded bar should be placed all the way through the post then bolted Use M8 screws and ø14 screw anchors to mount the base plate on the pillar Be sure to respect the 100mm minimum distance from the pavement Attach bracket A to the gate wing use M6 screws or welds Be sure to respect the offsets of 430mm and 68mm 14 14 14 14 14 Base plate Bracket A M8 M8 M8 M8 M8 M6 M6 M6 M6 M6 Front view 430 mm 1...

Page 6: ...ING STAGE 2 Wiring and Electrical PLEASE CHECK THAT YOU HAVE CORRECTLY Ref Page 1 Checked Requirements 1 1 3 2 Mounted Motor Base Plate 1 2 4 NOW STAGE 1 IS FULLY COMPLETED YOU ARE READY TO BEGIN STAGE 2 OF YOUR FAST AUTOMATION KIT INSTALLATION ...

Page 7: ... When installing low voltage cable around the gateway it is advised to put all low voltage cable in either ducting or alkathene piping All cable jointing should be carried out above ground All Came accessories can be wired 0 2m stranded cable burglar alarm type The tuned antenna should be wired with coaxial cable RG59 Tuned antenna Coaxial cable 4 Core SWA 1 5m Low voltage Mains power 2 core 1mm F...

Page 8: ...GE 2 BEFORE STARTING STAGE 3 Installation PLEASE CHECK THAT YOU HAVE CORRECTLY Ref Page 1 Installed Basic Cable Layout 2 1 6 NOW STAGE 2 IS FULLY COMPLETED YOU ARE READY TO BEGIN STAGE 3 OF YOUR FAST AUTOMATION KIT INSTALLATION ...

Page 9: ...ckwise 2 Raise the cover loosen the 3 9x13 screw and remove the cover from the gearmotor unit 3 Insert the gearmotor in the base plate align with the 4 holes and secure it with the two M8x90 bolts and nuts provided 1 3 9x13 3 9x13 3 9x13 3 9x13 3 9x13 1 2 3 M8x90 M8x90 M8x90 M8x90 M8x90 M8 M8 M8 M8 M8 4 ...

Page 10: ... arms with the M6x10 screw and 6x24 washer Release the gearmotor and fix the curved arm to the bracket A with the M12x40 screw and the M12 nut checking it is free moving For application on the right hand side see fig 2 M6x10 M6x10 M6x10 M6x10 M6x10 M12x40 M12x40 M12x40 M12x40 M12x40 M12 M12 M12 M12 M12 6x24 6x24 6x24 6x24 6x24 10x35 10x35 10x35 10x35 10x35 M10x14 M10x14 M10x14 M10x14 M10x14 Pin 10...

Page 11: ...t with the two upper screws 5 Adjustments of the microswitches with gearmotor installed on the left hand side internal view In opening release the gearmotor 1 and allow the gate to reach the opening position desired 2 Turn the lower cam clockwise until the microswitch is inserted and lock it with the central screw 3 In closing allow the gate to reach the closing position desired 4 Turn the upper c...

Page 12: ...iring PLEASE CHECK THAT YOU HAVE CORRECTLY Ref Page 1 Installed the Motors 3 1 8 2 Installed the Drive Arms 3 2 9 3 Adjusted the Open and Shut Cams 3 3 10 NOW STAGE 3 IS FULLY COMPLETED YOU ARE READY TO BEGIN STAGE 4 OF YOUR FAST AUTOMATION KIT INSTALLATION ...

Page 13: ...epare the connection as shown in figure 1 For gates with a delayed closure right hand gate prepare the connection as shown in figure 2 NB always mount the F7000 gearmotor on the left pillar internal view F 7001 F 7000 F 7000 SX F 7001 DX Fig Abb 1 U V W 2 1 4 3 PRO G F 7001 F 7000 Fig Abb 2 F 7000 SX F 7001 DX U V W 2 1 4 3 PRO G Fig 1 Fig 2 ...

Page 14: ...A g 2 1 4 3 PROG FUSI BIL I LI NEA5 A ZA5 FUSI BIL ECENTRALINA3 15A T L T C A FUSI BIL I LI NEA5 A ZA5 FUSI BIL ECENTRALINA3 15A T L T C A FUSI BIL I LI NEA5 A ZA5 FUSI BIL ECENTRALINA3 15A T L T C A FUSI BIL I LI NEA5 A ZA5 FUSI BIL ECENTRALINA3 15A T L T C A F 7000 DX Fig Abb 2 F 7000 FUSI BIL I LI NEA5 A ZA5 FUSI BIL ECENTRALINA3 15A T L T C A FUSI BIL I LI NEA5 A ZA5 FUSI BIL ECENTRALINA3 15A ...

Page 15: ... 5 ES 1 Keyselector 2 7 10 5 E W EB EB 24V 15W max 11 10 n o c n c L2 L1 C N O 2 1 Accessories not included in the kit ZF1 control panel terminal board Possible electrical connections on ZA3 ZA4 ZA5 ZM2 follow the related instructions on the control panel technical pamphlet 24V 3W max 230V 25W max Contacts 1 2 and 2 CX are N C contacts These contacts must be connected together if they are not used...

Page 16: ...Commissioning the Control Panel PLEASE CHECK THAT YOU HAVE CORRECTLY Ref Page 1 Wired the Motors 4 1 12 or 4 2 13 2 Made the electrical connections 4 3 14 NOW STAGE 3 IS FULLY COMPLETED YOU ARE READY TO BEGIN STAGE 4 OF YOUR FAST AUTOMATION KIT INSTALLATION ...

Page 17: ... power terminals L1 L2 and a suitable earth L2 being LIVE 2 Select the motor power setting on the transformer to level 1 for commissioning 3 Select dipswitches 1 2 off for commissioning 4 Ensure hard wire link is fitted between terminals 1 2 and 2 C1 ON OFF W X Y E L1 L2 7 2 C1 11 10 ES 5 ES 1 ...

Page 18: ...they start to close turn the power off to the control panel and change around either U V motor 1 or X Y motor 2 to change the motor direction 2 Once you have proven the motor direction use terminals 2 7 to open and close the gates with a trailing wire once again into terminal 2 momentarily touching terminal 7 W X Y E L1 L2 7 2 C1 11 10 ES 5 ES 1 W X Y E L1 L2 7 2 C1 11 10 ES 5 ES 1 ...

Page 19: ...to run for a further 5 7 seconds after the movement cycle has been completed i e fully open or fully closed Trimmer TL 3 Check the sensitivity of the gates by trying to physically stop the gate and adjust the power settings on the transformer accordingly If more power is needed for heavier gates then switch off power and move transformer wire up to setting 2 For rechecking sensitivity repeat proce...

Page 20: ... the gates after approximately 10 seconds and fully clockwise will close the gates after approximately 80 seconds A sensible setting is about halfway i e 6 o clock position which will automatically close the gates after approximately 30 seconds 2 For re opening during closing Remove hard wire link between 2 C1 and insert safety beam wires as shown ON OFF 7 2 C1 11 10 ES 5 ES 1 Trimmer TCA 6 o cloc...

Page 21: ...signal LED will start to flash At the same time transmit on one of the buttons of your remote control keep both the top button and the radio code save button pressed until the LED stops flashing and remains on constant It will then go out to indicate that the code has been successfully stored NB If you wish to change the code on your transmitter in the future simply repeat the procedure above with...

Page 22: ... pushbutton you want to copy for a few seconds fig B Once it has been saved the LED will flash 3 times and the transmitter will be ready for use Repeat 1 and 2 for the other pushbuttons NB the code of another system can be saved Use on new system Consult the documentation of the electric board to save the first transmitter then follow the procedure described above to duplicate it in the quantity d...

Page 23: ... completing the assembly operations electrical connections and adjustments insert the lid and secure it with the 3 9x13 screw insert the release knob in LOCK position and secure it LO CK UNLO CK 3 9x13 3 9x13 3 9x13 3 9x13 3 9x13 ...

Page 24: ...C1 5 1 16 2 Set the opening and closing times for gates 5 2 17 3 Adjusted the control panel 5 3 18 4 If required activated automatic closing and safety photocells 5 4 19 5 Programmed the remote to the control panel 5 5 20 6 Coded the remote controls 5 6 21 7 Fitted motor covers 5 7 22 NOW STAGE 3 IS FULLY COMPLETED YOU ARE READY TO BEGIN STAGE 4 OF YOUR FAST AUTOMATION KIT INSTALLATION ...

Page 25: ...30V a c output in motion e g flashing light max 25W 24V 3W max gate opened signal lamp N O contact radio and or button for control see dip 2 Contact N C for re opening during the closing Pushbutton stop N C 24V a c Powering accessories max 20W X W Y 5 10 U V W X Y E L1 L2 7 2 C1 1110 ES 5 ES 1 2 7 1 2 2 C1 10 11 12V 15W max connection for electrically actuated lock Antenna connection ES ES ...

Page 26: ...entify an obstacle while the gate is closing they will reverse the direction of movement until the gate is completely open Total stop 1 2 shutdown of gate movement without automatic closing a pushbutton radio remote control must be actuated to resume movement Optional accessories 12V Electric lock ES ES Open gate pilot lamp 3W max Lamp that signals the gate is open turns off when the time fixed fo...

Page 27: ...ustment automatic closing 8 2 dip function switch 9 Socket AF radio frequency board 10 Signal LED 6 5 Adjustments Trimmer T R 2M Adjustment delay during closure of 2nd motor min 1 max 10 Trimmer T L Adjusts operating time min 15 max 120 Note the operator present function is activated by setting the operating time to the minimum Trimmer T C A Adjusts automatic closing time min 0 max 120 2 1 PROG 1 ...

Page 28: ...D WIRE LINK FITTED BETWEEN TERMINALS 1 2 1 CHECK SAFETY BEAMS ARE WIRED CORRECTLY IF MORE THAN ONE SET OF BEAMS ARE FITTED THEY MUST BE WIRED IN SERIES 2 CHECK THAT THERE IS POWER GOING TO THE BEAMS IF NOT RESTORE POWER 3 IF SAFETY BEAMS ARE NOT FITTED ENSURE THAT A HARD WIRE LINK IS FITTED BETWEEN TERMINALS 2 C1 4 REMOVE SAFETY BEAM WIRES 2 C1 FROM CONTROL PANEL AND CHECK IF YOU HAVE A NORMALLY C...

Page 29: ...MMAND 1 AF FREQUENCY CARD NOT FITTED TO CONTROL PANEL 2 REMOTE CONTROL HAS NOT BEEN PROGRAMMED INTO THE CONTROL PANEL 3 REMOTE CONTROL HAS THE WRONG CODE SETTING 4 WRONG FREQUENCY CARD FITTED FOR THE REMOTE CONTROL 5 TERMINALS 1 AND 2 ARE NOT LINKED SOLUTION THIS INSTALLATION WAS COMPLETED BY NAME ADDRESS TEL MOBILE DATE OF INSTALLATION ...

Page 30: ...29 NOTES ...

Page 31: ...30 NOTES ...

Page 32: ...NIT 3 ORCHARD PARK INDUSTRIAL ESTATE TOWN STREET SANDIACRE NOTTINGHAM NG10 5BP TEL 0115 921 0430 FAX 0115 921 0431 INTERNET www cameuk com E MAIL enquiries cameuk com THIS INSTALLATION WAS COMPLETED BY NAME ADDRESS TEL MOBILE DATE OF INSTALLATION ...

Reviews: