p.
2
3
23
-
M
an
u
al c
od
e:
11
9
G
U
4
0
11
9
G
U
4
0
v.
1
12
/2
0
14
© C
A
M
E c
an
ce
lli auto
m
ati
ci S
.p.
A
. -
Th
e d
ata a
n
d i
nf
or
m
ati
on i
n th
is m
an
u
al m
ay b
e c
h
an
g
ed at a
ny ti
m
e a
n
d w
ith
ou
t n
oti
ce fr
om C
A
M
E C
an
ce
lli A
uto
m
ati
ci S
.p.
A
.
DISMANTLING AND DISPOSAL
☞
CAME CANCELLI AUTOMATICI S.p.A. employs a certified Environmental Management System at its premises, compliant with the UNI EN
ISO 14001 standard to ensure the environment is safeguarded.
Please continue safeguarding the environment. At CAME we consider it one of the fundamentals of our operating and market strategies. Simply
follow these brief disposal guidelines:
DISPOSING OF THE PACKAGING
The packaging materials (cardboard, plastic, and so on) should be disposed of as solid urban waste, and simply separated from other waste for
recycling.
Always make sure you comply with local laws before dismantling and disposing of the product.
DO NOT DISPOSE OF IN NATURE!
DISMANTLING AND DISPOSAL
Our products are made with different materials. Most of these (aluminum, plastic, iron, electrical cables) is classified as solid urban waste.
They can be recycled by separating them before dumping at authorized city dumps.
Whereas other components (control boards, batteries, transmitters, and so on) may contain hazardous pollutants.
These must therefore be disposed of by authorized, certified professional services.
Before disposing, it is always advisable to check with the specific laws that apply in your area.
DO NOT DISPOSE OF IN NATURE!
DECLARATION OF CONFORMITY
Declaration
-
Came Cancelli Automatici S.p.A. declares that this device conforms to the essential, pertinent requirements provided by
directives 2006/42/CE and 2004/108/CE.
An original copy of the declaration of conformity is available on request.
Extraordinary maintenance log
Extraordinary maintenance
⚠
The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
Any extraordinary maintenance jobs must be done only by specialized technicians.
Fitter's stamp
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed _________________________________________________________________________________________
________________________________________________________________________________________________
Fitter's stamp
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed _________________________________________________________________________________________
________________________________________________________________________________________________
Fitter's stamp
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed _________________________________________________________________________________________
________________________________________________________________________________________________