Page
9
- Manual
FA01560-EN
- 02/2023 - © C
AME S.p.A. - The contents of this manual may be changed at any time and without notice. - T
ranslation of the o
riginal instructions
INSTALLATION
The following illustrations are examples only. The space available for fitting the operator and accessories varies depending on the area where it is installed. It is
up to the installer to find the most suitable solution.
In case of manual handling, have one person for every 20 kg that needs hoisting; for non-manual handling, use proper hoisting equipment in safe conditions.
When the operator is being fixed in place, it may be unstable and overturn. Be careful and do not lean on it until it is fully fastened in place.
Preliminary operations
If the flooring does not allow the device to be fastened in a solid and stable way, lay a cement slab.
Dig a hole for the foundation frame.
Set up the corrugated tubes needed for the wiring coming out of the junction pit.
The number of tubes depends on the type of system and the accessories that are going to be fitted.
r 40
350
400
200
Laying the anchoring plate
Set up a foundation frame that is larger than the anchoring plate.
Fit an iron cage in the foundation frame to reinforce the concrete.
Assemble the anchoring braces to the plate.
Fit the anchoring plate in the iron cage.
The tubes must pass through the existing holes.
Cast cement into the foundation frame.
The plate must be perfectly level and the screw threads completely above surface.
Wait at least 24 hours for the cement to dry.
Remove the foundation frame.