1
N
M
PT F
FC FA
4
2
3
p.
7
- M
an
u
al
c
od
e:
F
A
0
0
6
8
8
-E
N
FA
0
0
6
8
8
-E
N
v.
0
6
/2
0
17
- © C
am
e S
.p.
A
. T
h
e c
onte
nts of th
is
m
an
u
al
m
ay b
e c
h
an
g
ed at a
ny ti
m
e w
ith
ou
t p
rio
r n
oti
ce
.
Preparing the barrier
Remove the two screws on the top dome
,
fit the key into the lock and turn it counter clockwise
.
Lift the dome
and remove the inspection hatch
.
Left
Right
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
⚠
Warning!
The barrier is set up for installing on the left.
When installing on the right, invert the boom's opening direction, as follows:
- remove the anchoring pin from the lever arm
;
- release the gearmotor by using the key;
- turn the lever arm by 90°
;
- lock the motor again;
- fasten the anchoring pin to the opposite hole on the arm
;
- invert cables M with N and FA with FC
.
Summary of Contents for G4040Z
Page 25: ...Installation manual G4040Z G4040IZ AUTOMATIC BARRIERS FA00688 EN English EN...
Page 49: ...Manuel d installation G4040Z G4040IZ BARRI RES AUTOMATIQUES FA00688 FR Fran ais FR...
Page 73: ...G4040Z G4040IZ FA00688 RU RU...
Page 74: ...2 FA00688 RU FA00688 RU 1 06 2017 Came S p A CAME S P A 2 5 20 1 8 1 5 EN12453 EN12445 8...
Page 78: ...5 0 0 3 4 0 400 r 40 6 FA00688 RU FA00688 RU 1 06 2017 Came S p A 24...
Page 79: ...1 N M PT F FC FA 4 2 3 7 FA00688 RU FA00688 RU 1 06 2017 Came S p A 600 90 M N FA FC...
Page 80: ...G03756 G03750 8 FA00688 RU FA00688 RU 1 06 2017 Came S p A UNI5931 M8x20 G03750 G03756...
Page 83: ...45 4 5 4 5 11 11 FA00688 RU FA00688 RU 1 06 2017 Came S p A 45...
Page 87: ...1 15 15 FA00688 RU FA00688 RU 1 06 2017 Came S p A...
Page 91: ...4 19 19 FA00688 RU FA00688 RU 1 06 2017 Came S p A...
Page 94: ...22 22 FA00688 RU FA00688 RU 1 06 2017 Came S p A 6...