400
600
250
24h
ENGLISH
P
age
88
-
M
a
nual
C
o
de
:
1
1
9
G
V
2
2
1
1
9
G
V22 v
e
r.
2
.1
2
.1
1
2
/2
0
11 © C
A
M
E
c
a
n
ce
lli a
u
to
mati
ci
S
.p.
a
. - T
h
e d
a
ta a
n
d i
n
fo
rm
ati
o
n
i
n
thi
s ma
nu
a
l ma
y b
e c
h
a
n
g
e
d at a
n
y time a
n
d with
o
ut
o
b
lig
ati
o
n
o
n
the p
a
rt
of C
a
me C
a
n
ce
lli A
u
to
mati
ci
S
.p.
a
. to n
o
tify s
a
id
c
h
a
n
g
e
s.
Assmble the four clamps to the anchoring base.
Fill the pit with cement, submerge the base making sure that the corrugated tubes pass through the hole on the base. The base must be
perfectly level, clean and with the bolt threading completely on the surface.
Wait at least 24 hrs for everything to solidify. Remove the nuts and washers from the threaded bolts.
The following illustrations are just examples, in that the space for securing the operator and accessories depends on the overall
measurements. It is up to the installer to choose the most suited solution.
Dig a pit for the achoring base, set up the needed corrugated tubes for connections coming from the junction pit.
N.B. the number of tubes depends on the type of installation and accessories used.
Preparing the anchoring base
M12 UNI5588 nut
M12x40 UNI
5739 screw
Washer
Summary of Contents for G6500
Page 29: ...B a r r i e r l i n e G6500 SERIES GARD INSTALLATION MANUAL STREET BARRIERS English EN 9 1...
Page 85: ...B a r r i e r l i n e G6500 GARD RU 9 RU...
Page 94: ...362 mm 10 10 119 G V 22 119 G V 22 2 1 2 1 12 2011 2011 CAME cancelli automatici s p a 6500...
Page 96: ...12 12 119 G V 22 119 G V 22 2 1 2 1 12 2011 2011 CAME cancelli automatici s p a...
Page 107: ...CA ME 2 3 2 3 119 G V 22 119 G V 22 2 1 2 1 12 2011 12 2011 CAME cancelli automatici s p a...
Page 111: ...27 27 119 G V 22 119 G V 22 2 1 2 1 12 2011 12 2011 CAME cancelli automatici s p a...