background image

Automatic road barriers

G3250

G3250X

G3250A

INSTALLATION MANUAL

FA01626-EN

EN

English

Summary of Contents for GARD G3250

Page 1: ...Automatic road barriers G3250 G3250X G3250A INSTALLATION MANUAL FA01626 EN EN English...

Page 2: ...m is no longer intact as the result of an accident or installation error In these cases the tensioned springs no longer guarantee that the boom is balanced The boom may suddenly rotate when being rele...

Page 3: ...th the installation rules It should completely cut off the power supply according to category III surcharge conditions Demarcate the entire site properly to prevent unauthorised personnel from enterin...

Page 4: ...uidelines DISPOSING OF THE PACKAGING The packaging materials cardboard plastic etc can be disposed of easily as solid urban waste separated for recycling Before dismantling and disposing of the produc...

Page 5: ...lvanized steel designed to fit accessories Intended use Ideal solution for apartment blocks and industrial use Any installation and or use other than that specified in this manual is forbidden Usage l...

Page 6: ...of the original instructions Description of parts Barrier 1 Anti shearing cover 2 Boom attachment 3 Boom anchoring plate 4 Lock for release 5 Inspection hatch 6 Microswitch support plate 7 Mechanical...

Page 7: ...nnecting the transponder selector switch 5 Display 6 Accessories fuse 7 Control board fuse 8 Terminal board for connecting the transformer 9 Terminal board for connecting the transformer thermal cut o...

Page 8: ...o connect the antenna use RG58 cable up to 5 m For installation in an outdoor environment use cables with properties at least equivalent to those of type H05RN F with designation 60245 IEC 57 For inst...

Page 9: ...lly fastened in place Preliminary operations If the flooring does not allow the device to be fastened in a solid and stable way lay a cement slab Dig a hole for the foundation frame Set up the corruga...

Page 10: ...nged at any time and without notice Translation of the original instructions Fill the hole with soil around the concrete block Remove the nuts from the screws Insert the electrical cables into the tub...

Page 11: ...ice Translation of the original instructions Changing the boom opening direction The barrier is set up for installation on the left If the boom has already been assembled lift it up to a vertical posi...

Page 12: ...Lock the gearmotor and fit the mechanical stops on the opposite end Fit the boom anchoring plate again using threadlocker on the screws Fit the microswitch support plate and reattach the spring Invert...

Page 13: ...symbol one every metre 2 Insert the rope light into the grooves on both sides of the boom 3 Fit the insulating cap to one end of the rope light 4 Thread the power supply cable through the hole in the...

Page 14: ...es to the same size as the boom slot minus 10 millimetres 2 Insert the slot cover profiles into the grooves on both sides of the boom 3 Insert the anti impact rubber profile into the groove 4 Cut off...

Page 15: ...boom 1 Release the gearmotor 2 Loosen the clamping nut on the rod 3 Manually turn the spring to increase or reduce the traction The boom should stabilise at 45 4 Fasten the locknut Position the boom v...

Page 16: ...with mechanical limit switches Check that the boom is parallel to the road surface when it is in the closed position and at about 89 when it is in the open position Correct the boom s horizontal posi...

Page 17: ...time and without notice Translation of the original instructions Correct the boom s vertical position Release the gearmotor Open the inspection hatch 1 Turn the mechanical stop until you reach the des...

Page 18: ...ocedures Before working on the control panel disconnect the mains power supply and remove the batteries if any Connecting to the electrical network F Line fuse L Phase N Neutral Earth F Power supply o...

Page 19: ...ng 2 Control device NO contact OPEN ONLY function When the HOLD TO RUN function is active the control device must be connected during OPENING 3 Control device NO contact PARTIAL OPENING function The c...

Page 20: ...and closes 10 11 E1 E6 Rx Tx 1 2 3 3P 4 5 7 CY CX 1 3 Safety devices Connect the safety devices to the CX and or CY inputs During programming configure the type of action that must be performed by th...

Page 21: ...nction F60 Sleep Mode DIR DELTA S photocells Standard connection Multiple photocell pairs can be connected Connection with safety test Multiple photocell pairs can be connected See function F5 Safety...

Page 22: ...be connected DXR DLX photocells Connection with safety test Multiple photocell pairs can be connected See function F5 Safety devices test RX TX 10 11 OUT 10 11 SY 10 11 E1 E6 Rx Tx 1 2 3 3P 4 5 7 CY...

Page 23: ...t manoeuvre is always to open the gate Wait for the manoeuvre to be completed Press the ESC button or STOP button immediately in the event of any faults malfunctions strange noises or vibrations or un...

Page 24: ...Open warning light Barrier status warning Device connected to the 10 5 output F10 Open warning light 0 Warning light on default The light stays on when the boom is moving or open 1 Warning light flash...

Page 25: ...e during opening and closing F22 Operating time 5 to 120 seconds default 20 seconds Courtesy time Set the lighting device operation time F25 Courtesy time 60 to 180 seconds Default 180 seconds Opening...

Page 26: ...ry roll or USB key F51 Read data 0 Deactivated Default 1 Activated Transferring MASTER SLAVE parameters Enable the sharing of parameters programmed on the Master barrier with the Slave barrier This on...

Page 27: ...mmand opens the Master barrier Choose the function to be assigned to the user Press ENTER to confirm You will be asked to enter your user code Send the code from the control device Repeat the procedur...

Page 28: ...neuvers FW version Display the firmware version number H1 FW version Import export data 1 Insert the MEMORY ROLL card into the corresponding connector on the control board 2 Press the Enter button to...

Page 29: ...RSE connector Connect up the electrics for the devices and accessories For information on connecting the electrics for the devices and accessories please see the ELECTRICAL CONNECTIONS section The dev...

Page 30: ...ON The first barrier opens the vehicle passes the first barrier closes the second barrier opens the vehicle passes and the second barrier closes Electrical connections Connect the two electronic board...

Page 31: ...ction F49 Press ENTER to confirm Select 2 Select function F52 Select 1 Saving users All save user operations must be performed only on the control board set as the MASTER For user storage operations s...

Page 32: ...t installation manual For information on choosing products and accessories please see our product catalogue If the barrier with an articulated joint is used check that the moving parts of the joint ar...

Reviews: